My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
00-9195
Zephyrhills
>
Building Department
>
Permits
>
2000
>
00-9195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 4:15:38 PM
Creation date
9/7/2006 8:46:21 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
00-9195
Building Department - Name
KAUFFMAN,STUART
Address
6329 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AUG-14-2000 11:25 AM MILBAR CONSTRUCTION INC. 352 567 4454 <br />08/14/00 NON 10;:H FAX ,T3U83481 CONTRACTOR SERVICES <br /> <br />P.01 <br />aJ 001 <br /> <br />_T{ , <br />"""'" <br /> <br />August 11, 2000 <br /> <br />Milbar construction Incorporated <br />15911 HWV 301 North <br />Dade City, Ronda 33523 <br /> <br /> <br />Dale <br /> <br />Po.t.lt" Fax Note <br />Tv <br />-- GAP MATERIALS CORPORATION <br />:-~ CoJOe <br />~ 13e1 Alp. "'oed Wiyl1e NJ 0747003tlB9 . Tel: '7~e2a.300c <br />11III PlIon. . <br /> <br />".. . <br /> <br />Fex; <br /> <br />3S2-561-4454 <br /> <br />Project: <br />Re: <br /> <br />Flond! Eye Care Center <br />FtoQfer Stotu5 <br /> <br />To Whom It May Concern, <br /> <br />This Is to a>ntlrm that Mllbar Construction Incorporated of Dade CIty, florida Is a GAF <br />Materials Corporation Master Reotlng Contractor. Mllbar COnstruction lf1a)rporated Is <br />eligible to obtain a GAF Materials COrporation Liberty System (NDL) guarantee for up to <br />20 vears, Provided that all current GN= Materials Corporation's appllCBtton and <br />specification requlremen~ are met and procedures are followed. <br /> <br />This is also to confirm that RUBEROlO@ spedftcatlon I-3-1-MGPfR Is eligible to receive <br />a LIberty Guarantee for up to 20 years Provtcllng that It Is Installed by a GAF Master <br />R.ooftng Contractor and all cummt GAF requirements and speclncatlons are met and <br />procedu~ followed. <br /> <br />ThIs Is conftrm that counterflashlng must be provtded to rover the top edge Of <br />composition base flashing by a minimum of 4". Wall covertng and counterflashlng, <br />whetner metal or composltton materials, are not considered part or the flashing <br />spedncatlon and are not Included In GAF Materials Corporation Guarantees. <br /> <br />If you have any further Que5t1on5, ple~se feel free to contact uS at 1~800-R()()F-411, <br />Thank you for choosIng GAFMC RootIng Systems. <br /> <br />~ <br /> <br />TechnICal ServICeS RepresentatIVe <br />
The URL can be used to link to this page
Your browser does not support the video tag.