My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
00-9195
Zephyrhills
>
Building Department
>
Permits
>
2000
>
00-9195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 4:15:38 PM
Creation date
9/7/2006 8:46:21 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
00-9195
Building Department - Name
KAUFFMAN,STUART
Address
6329 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AUG-14-2000 11:25 AM MILBAR CONSTRUCTI.ON INC. 352 567 4454 <br /> <br />~$/14/00 MON 10:31 PAX "38113481 <br /> <br />CONTRACTOR SERVICES <br /> <br />P.01 <br />1001 <br /> <br />"'1\ <br />,.~ <br /> <br />August 11, 2000 <br /> <br />Milbar construction Incorporated <br />15911 HWV 301 North <br />Dade City, F10rtda 33523 <br /> <br /> <br />7671 0If8 <br />"... <br /> <br />Poet.I'" Fax Note <br /> <br />To <br />.. GAP MATlRIALI CORPORATION c <br /> <br />~ 1301 ~ "08d Wayne NJ 07'470-aen · r.,: ,7s.e1l1.300c <br />;;II PIlon. , <br /> <br />F... <br /> <br />Fax: <br /> <br />3S2-561-4454 <br /> <br />Project: <br />Re: <br /> <br />Flortd. Eye Care Center <br />~oofer Stilus <br /> <br />To Whom It May Concern, <br /> <br />ThIs Is to conflrm that Mllbar Construction Incorporated of Dade Oty, florida Is a GAF <br />Materials COrporation Master Rooflng Contractor. Mllbar construc:tlon Incorporated 15 <br />eligible to obtain a GAF Matertals Corporation Liberty System (NeL) guarantee for up to <br />20 years, Provided that all current GAP MaterIals Corporation's appllcatton and <br />speclflcMIan requirement! are met and procedures are followed. <br /> <br />This is also to connrm that RUBEROlD@speclftcatlon [-3-1-MGPfR Is eligible tD receive <br />a LIberty Guarantee for up to 20 years ProvtCllng that It Is InsaUe(! by a GAF Master <br />R.oofIng Contractor and all current GAF requirements and specIfications are met and <br />fo'rocedu" followed. <br /> <br />ThIs Is conftrm that counterfJashlng must be provided to rover the top edge Of <br />composition base "ashlng by a minimum of 4". watt covertng and cOLJnterftashlng, <br />whether metal or composition matertals, are not considered part of the f'Iashing <br />spedftcatlon and are not Included In GAJI Materials Corporation Guarantees. <br /> <br />If you hive any further questions, ~se feel free to contact us at l..aOO-ROOF-411. <br />Thank you for chOOSing GAFMC RootIng Systems. <br /> <br />~ <br /> <br />TechnICal Services Representattve <br />
The URL can be used to link to this page
Your browser does not support the video tag.