My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
00-9502
Zephyrhills
>
Building Department
>
Permits
>
2000
>
00-9502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2006 7:12:33 AM
Creation date
9/14/2006 11:38:55 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
00-9502
Building Department - Name
NATIONS BANK
Address
5632 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A.p!:' 10 00 08:47a <br /> <br />Cit~ of 2eph~rhills <br /> <br />(813) 788-:3293 <br /> <br />p.2 <br /> <br />COMMERCIAL BUILDING PERMIT REQUIREMENTS <br /> <br />CITY OF ZEPHYRHILLS <br /> <br />5335 - 8th street <br />Phone: 813-788-6611 Fax: 913-788-3293 <br /> <br />1. All Site Plan Review requirements must be satisfied before peomit issuance. <br /> <br />2. Three (3) sets of Building Plans - professionally signed & sealed showing <br />Electrical, Plumbing and Mechanical layouts. <br /> <br />3. Applicable Florida Energy Efficiency Code Form. <br /> <br />4. Licensing Requirements: (al Proof of either State Certified License or County <br />Competency License with State Registration (b) County Occupational License (c) <br />Certificate of Insurance on Worker's Comp or State Exemption (d) $20.00 processing <br />fee for each contractor. Notarized authorization letter is required if anyone <br />other than license holder signs pennit or application. Property that will be <br />rented, leased or sold, will have to be contracted by properly licensed people as <br />per state law. <br /> <br />5. Fully executed building permit application must be submitted with construction <br />plans with payment of application fee of $.03 per square foot ($15 minimum); said <br />fee will be ~creditedH at time of permitting. <br /> <br />6. Sewer & Water Connection Fees, Transportation Impact Fees and Water l"Ieter Fee must <br />be paid prior to or at the time of permit issuance. <br /> <br />7. For Construction Codes see attachment Ordinances #430 & #669. <br /> <br />8. Annual Solid Waste Assessment Fee must be paid prior to issuance of Certificate of <br />Occupancy. <br /> <br />9. Allowance of ten (10) working days after submittal date required for plans <br />approval. <br /> <br />10.Inspection requests are scheduled for the following workday. <br /> <br />11. City Right-of-Way Use Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.