My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
00-9588
Zephyrhills
>
Building Department
>
Permits
>
2000
>
00-9588
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2006 6:20:04 AM
Creation date
9/15/2006 6:50:13 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
00-9588
Building Department - Name
BORNSTINE,KAREN
Address
3748 & 3752 COPELAND
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARTICLE 5 <br />PROGRESS PAYMENTS <br /> <br />5.1 Based upon Applicltions for P;Jyment submillnl to tlie Arclllll'CI bl the COl1lr;IC(()f" and Cl'!'t1tkates fur Payment issued h\ Illl' <br />Architect, the Owner shall m:lke progress pa\'menls (,n aCl'ounl of the Contract Sum to the Contractor ;lS provided Ix'low and <br />elsewhere in the Contract Documents, <br /> <br />5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, ur ;lS <br />follows: <br /> <br />5.3 Provided an Application for Payment is received by thl' Architect not later than the TWENTY FIFTH <br />day of a month, the Owncr shall make pavmcnt to the Contractor notlatl'!' than <br />the TENTH day of the FOLLOWIN(gonth, If an Application for Payment is rc'c'l'ived by the <br />Architect after the application date tlxed abovc', payment shall be made by the Owner not later than <br />days after the Architect receives the Application for Payment. <br /> <br />5.4 Each Application for Payment shall be hased upon the Schedule of Values submitted by the Contractor in ;Jccordancl' with <br />the Contract Documents, The Schedule of Values shall allocate the entire Contract Sum among the various portions of the \X/ork <br />and be prepared in such form and supported b\' such data to substantiate its accuracy as the Archit('('t may requirl' Thi.s Schnlult, <br />unless objc'l'ted to by the Architect, shall be usnl as a b;l.S1s for reviewing the Contra('!()f"'.s Applicltions 1<,,' P;iyml'llI <br /> <br />5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the pel'lod <br />covered by the Application for Payment, <br /> <br />5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as f()lIows' <br /> <br />5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as detennllled by multiplYlflg the pelu'nta).(l' <br />completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the \\'ork In till' <br />Schedule of Values, less retainage of TEN lX'l'l'l'nl <br />(10 IX,), Pending tlnal determin:ltion of cost to the Owner of changes in the Work, alllou:lts not in dispute 1ll;1\' bl' <br />included as provided in Subparagraph 7,5,7 of the (ienl'!'al Conditions even though the Contract SUIll has not yet been adjusted b\ <br />Change Order; <br /> <br />5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delin:red and suitably stored at the <br />site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off tile <br />site at a location agreed upon in writing), less retainage of TEN <br />percent ( 10 %); <br /> <br />5.6.3 Subtract the aggregate of previous payments made by the Owner; and <br /> <br />5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided In PaL,' <br />graph 9,5 of the General Conditions <br /> <br />5.7 The progress payment amount determined in accordance with Paragraph 5,6 shall be further modified uncler thl' fo!l()willg <br />circumstances: <br /> <br />5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to <br />ONE HUNDRED percent ( 100 %) of the Contral'[ <br />Sum, less suc'h amounts as the Architect shall determine for incomplete Work and unsettled claims; and <br /> <br />5.7.2 Add, if tlnal completion of the \';-'ork is tllL'l'e;li'ter lllaterLilly delayed through no fault of the Contractor, any addillonal <br />amounts payable in accordance with Suhparagr;iph <),1 (),5 of the General Conditions, <br /> <br />5.8 Reduction or limitation of I'etainage, If anv, shall he as follows: <br /> <br />(If i/ is in/ended, pl'iol' /0 Subs/alllia/ Com/J/elioll oJ Ihe elllll'e U""I'.(>. (() I'eel//((' (II' /1/11I1 Ibe I'('/aillal<e I'es//ltilll< /ml/1 Ibe fiene/ltal<es illsel'!ed 1/1 ,'//1)/1(//'(/ <br />graphs 5.6. J and 5.6.2 abOl'(!, and tlJls is nut e.\/JItJiJ/ed l'Isi'lrher(' ill the CUIl/rael 1)()(:ume1l1s, iusert here pnwismlls lor SIK/) redUCl/(1fI or 11mila/IUN } <br /> <br />UPON (50%) FIFTY PERCENT COMPLETION RETAINAGE WILL BE REDUCED <br />TO (5%) FIVE PERCENT. <br /> <br />AlA DOCUMENT Al0l . OWNI:H-CONTRACTOR A(;HH~IENT . TWHFTII UlITIO:-; . AlA"' . (( I\.lH' <br />TIlE AMERICAN INSTITUTE OF ARCIIITECTS, 1755 NEW YURK AVENUE, NW, WASlIlNUrUN, D.l. 2(Jll(X) <br /> <br />A101.1987 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.