Laserfiche WebLink
<br />Mtl 'Bldg Roof/R-19 Batt <br /> <br />Light .051 19 4500 <br />Total Roof Area in Zone 2 = 4500 <br />Total Roof Area = 13300 <br /> <br />1-------------------------------_________________ <br /> <br />Insul R Area (Sqft) <br /> <br />405.------FLOORS-ZONE <br />Type <br /> <br />------------------------------------------------ <br /> <br />Slab on Grade/Insulated <br /> <br />405.------FLOORS-ZONE <br />Type <br /> <br />4 13300 <br />Total Floor Area in Zone 1 = 13300 <br /> <br />2--------------------------------________________ <br /> <br />Insul R Area (Sqft) <br /> <br />------------------------------------------------ <br /> <br />/ <br /> <br />./ <br /> <br />Slab on Grade/Insulated 4 0 <br />Total Floor Area in Zone 2 = 0 <br />Total Floor Area = 13300_/ <br />406.------INFILTRATION------------------------__________________________ <br /> <br />IC~EC) <br />Infiltration Criteria in 406.1.ABCD have been met. V' <br /> <br />MECHANICAL SYSTEMS <br /> <br />CHECK <br /> <br />------------------------------------------------------------------1----- <br /> <br />HVAC load sizing has been performed. (407.1.ABCD) ~ <br />407.------COOLING SYSTEMS-----------------------------_______________~__ <br />Type No Efficiency IPLV Tons <br /> <br />---------------------------- <br /> <br />---------- ----- -------------- <br /> <br />1. Evaporatively <br />2. Evaporatively <br />408.------HEATING <br />Type <br /> <br />Cooled 1 12 12 23.00 <br />Cooled 1 12 12 10.00 <br /> <br />SYSTEMS--------------------------______________________ <br /> <br />No Efficiency BTU/hr <br /> <br />-------------------------------- <br /> <br />---------- -------------- <br /> <br />~/ <br /> <br />1. Electric Resistance 1 .92 120000 <br /> <br />4~9.~=:~~=~~~~~;i~~~:------------------=-___________~:~____.______~~~~~ __~ <br /> <br />I CHECK <br />Ventilation Criteria in 409.1.ABCD have been met. <br />410. - - - - -AIR DISTRIBUTION SYSTEM- - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ - _ <br />CHECK <br /> <br />----~~~~-~i;i~;-~~d-d~~i;~-~~~~-b~~~-~~~~;~~d~-(~~~~~~~~~)-------I----- <br /> <br />AHU Type Duct Location R-va ue <br /> <br />----------------------------------- ---------------------.- <br /> <br /> <br />1. Packaged Constant Volume <br />2. Packaged Constant Volume <br /> <br />Conditioned Space <br />Unconditioned Space <br /> <br />6 <br />CHECK <br /> <br />-------------------------------------------------------------------1----- <br /> <br />Testing and balancing will be performed. (410.1.ABCD) ~ <br />411.-----PUMPS AND PIPING-ZONE -----_____________________________________ <br />Basic prescriptive requirements in 411.1.ABCD have been met. I ~ <br /> <br />PLUMBING SYSTEMS <br /> <br />411.-----PUMPS AND PIPING-ZONE <br />Type <br /> <br />1------------------_____________________ <br /> <br />R-value/in Diameter Thickness <br /> <br />------------------------ <br /> <br />---------- -------- --------- <br /> <br />1. Circulating <br />411.-----PUMPS AND PIPING-ZONE <br />Type <br /> <br />511 <br /> <br />2------------------_____________________ <br /> <br />R-value/in Diameter Thickness <br /> <br />------------------------ <br /> <br />---------- -------- --------- <br /> <br />/ <br />