My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
00-9791
Zephyrhills
>
Building Department
>
Permits
>
2000
>
00-9791
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2006 7:15:13 AM
Creation date
9/19/2006 9:23:59 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
00-9791
Building Department - Name
TORRES,EDGAR
Address
KENNEDY AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7.6 The Contractor at all times shall keep the premises free from accumulation of waste <br />materials or rubbish caused by this work. <br /> <br />7.7 The Contractor shall permit the Community Development Division to examine and inspect <br />the construction work under this contract at any reasonable time. <br /> <br />7.8 The Contractor shall furnish the Owner and the Community Development Division with the <br />names, addresses, and telephone numbers of the firms to be contacted for service to the <br />various appliances or other equipment that was installed or repaired under this contract. <br /> <br />7.9 The Contractor shall indemnify and save harmless the County, its agents and employees, <br />and the Owner from liability for any injury or damages to persons or property resulting <br />from the Contractor's prosecution of work pursuant to the provisions of this contract. <br /> <br />ARTICLE 8. - GENERAL RESPONSIBILITIES OF THE OWNER: <br /> <br />8.1 The Owner shall permit the Contractor to use, at no extra cost, existing utilities such as <br />light, heat, power, and water necessary for the proper execution and completion of the <br />work. <br /> <br />8.2 The Owner and occupants shall cooperate with the Contractor to facilitate the perfor- <br />mance of the work and are responsible for the removal or protection of rugs, furniture, <br />and clothing, if necessary. <br /> <br />8.3 The Owner and occupants shall be responsible for the proper use and care of the <br />property including all equipment and appliances. <br /> <br />8.4 The Owner shall provide the Contractor with access to the property during normal working <br />hours on normal working days. <br /> <br />ARTICLE 9. - GENERAL RESPONSIBILITIES OF THE COMMUNITY DEVELOPMENT DIVISION: <br /> <br />9.1 The Community Development Division shall provide general administration of the <br />contract, but it is understood by all parties that the County is not a party to this Contract. <br /> <br />9.2 The Community Development Division shall make frequent inspections of the work while <br />it is in progress to determine if it is proceeding in accordance with the contract docu- <br />ments. <br /> <br />9.3 The Community Development Division shall have the authority to reject work which does <br />not conform to the contract documents. <br /> <br />ARTICLE 10. - CONTRACT DOCUMENTS: This contract consists of the Bid Proposal, the Work Write- <br />Up, including any drawings or plans, the General Bid Specifications, and any insurance policies specified in <br />Article 5 above. <br /> <br />ARTICLE 11. - CHANGES IN THE WORK: Except in an emergency endangering life or property, no <br />change in the work shall be made by the Contractor unless he has received a prior written order signed by the <br />Owner and authorized representatives of the Community Development Division. The contract sum and the <br />contract time may be changed only by Change Order. No extra costs will be paid to the Contractor when he has <br />neglected to properly evaluate the extent of the construction work. <br /> <br />molg100218/17 <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.