Laserfiche WebLink
<br />~PEC. DESCRIPTION OF WORK LOCATION COST <br />72 INTERIOR DOORS <br /> Furnish and install new louvered door for the new air handler Hall <br /> closet. Field verify. <br /> Furnish and install a new prehung door and lackset. <br /> 2' .8" x 6' -8" and 2'...()" x 6'.8" Bedroom #2 <br />82 ELECTRICAL <br /> Install new hard wired smoke detectors to code. (3 ) See plan <br /> Install a new ceiling fan with light and switch. Bedroom #2 <br /> Install a newGF~I. .outlet. . Bathroom (1) <br /> ,. Kitchen (1) <br /> . <br /> Convert existing outlet to GFCI.( 1 ) Kitchen ( 1 ) <br /> New outlets. Kitchen (2) <br /> Bedroom #2 (1) <br /> Living room (4) <br /> Install new 125 amp electrical panel to code. Entire house <br /> Repair all electrical code items in the house. Allow. $300.00 <br /> Install a new 220volt outlet Stove (1) <br /> Dryer (1) <br />83 H. V.A.C. <br /> Install a new 2 Ton central heating and air conditioning <br /> system complete with all new ductwork, all controls and <br /> electrical. (minimum SEER required - 10.0) 5 KW heat <br /> strip. Standard air cooled condensing unit set on a concrete <br /> pad. (Heat pump not required) AH. unit will be installed <br /> in an existing closet. See plan Entire house <br /> <br />, <br />PAGE TOTALS <br />CUMTOTAL S <br /> <br />NAME: YEPEZ <br /> <br />DATE: 09n2/00 <br /> <br />PAGE: 2 <br />