Laserfiche WebLink
<br />BUILDING PERM!! 0997"0 <br />CITY OF ZEPHYRHILLS <br />(813)788-6611 Dot. v_h/oo <br /> <br />BUI~ING <br /> <br />PLU~ING <br /> <br /> <br />Property Owner: A \; c... " Ct fe.r I'\Q...... Je z,. <br />Job Address: S 5 ') 0 lo~ St. <br /> <br />1S-'~ <br /> <br />MECH~CAL <br /> <br />Sewer Conn <br />Water Conn: <br /> <br />ELECTRICAL <br /> <br />Water Meter: <br />T.I.F.'s: <br /> <br />Parcell.D. # <br />Zoning: Energy Code: <br />Descriotion of Work ~ e c.J./,' c Ct , en....J k+ t <br /> <br />Radon Gas: <br /> <br />FINAL <br /> <br />12...- ,2-- eo <br />DATE <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances, <br /> <br />c.o. <br /> <br />DATE <br /> <br />Inspector <br /> <br />s>P <br />.... <br /> <br />.~ <br />Permit Fee . <br />)I Signature~' . <br />Company <br />Address <br />.::;I Telephone# -2f~ ~~ d471- <br /> <br />~p <br /> <br />Valuation or <br />Contract Price <br /> <br />City License Registration # <br />State Certified License# <br /> <br />OWNfA'{ <br /> <br />Driveway <br /> <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br /> <br />ME HANICAL <br /> <br />BUlL ING <br /> <br />ELECTRICAL <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br />Tp. Servo <br />Rough In <br />Meter Can <br />Const. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Compresso <br />Final <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($ 25.001 shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />c. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />