Laserfiche WebLink
<br />BUILDING PERMIT <br /> <br />BUILDING <br /> <br />:tt ~5 <br />ELECTRICAL <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788-6611 <br />tt4'1. ~c <br /> <br />Permit <br /> <br />09992 <br /> <br />Date . J;;J -- /4. 0 0 <br /> <br />PLUMBING <br /> <br />~ 30. GO <br />MECHANICAL <br /> <br />Sewer Conn <br /> <br />~ I '15" <br /> <br />Water Conn: <br /> <br />Property Owner: (2~ ~. ~ <br />Job Address: R~,)o~L. ~ax. <br />Parcell.D, # J I~ 2..b-2./-0Q/{!)- "1000 -Ot:!J1/ <br /> <br />Zoning: Energy Code: Radon Gas: <br />Description of Work Cmwe..rd:: ~ ~~ ~~~ <br /> <br />Water Meter: <br /> <br />T.I.F.'s: <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />FINAL <br />C.O. <br /> <br />.J.I- <br /> <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />DATE <br /> <br />Inspector <br /> <br />Permit Fee .it 30 'J, !5~() <br /> <br />Signatur~~~ <br />Company G-l ~ <br /> <br />Address <br />Telephone# <br /> <br />2Y <br /> <br />Valuation or .i:i <br />Contract Price 3~ 0 O~ <br /> <br />City License Registration # 3 oS- <br />State Certified License# <br /> <br />G-~ ~~ <br />*3l3S <br />BUILDING <br /> <br />~~ rkl <br /> <br />ELECTRICAL <br /> <br />~!J~ ~~1 <br />~\\P <br />PLUMBING <br /> <br />B~\\A ct\I <br />~ \'1 <br />MECH~NICAL <br /> <br />SLB / - I <i~ 0/ 5} n..... <br />Tub Set 3-lt,a I @) <br />Water <br />Sewer <br />Final <br /> <br />Ftr. <br />Pre SLB 1,./1,(J)/ ~tt <br />. <br />Lintel <br />FRM. .~-t1..--4J I ~ <br />Insul. CL <br />WL <br /> <br />Tp. Servo w.. <br />Rough In 5..1~-D1 <br />Meter Can <br />Const. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />Breakers <br />Ducts Insl.3 - t 2..[> c/'f.,iJ!) <br />Compressor <br />Final <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($ 25.001 shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />c, Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e, Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same, <br />