Laserfiche WebLink
<br /> <br /> <br />. ~;1C"'" <br /> <br /> <br />November 12,2000 <br /> <br />~Mv~r O~~ <br /> <br />Community Association <br />6000 Silver Oaks Drive <br />Zephyrhills, Florida 33541 <br />(813) 779-2844 <br /> <br />Silver Oaks Realty <br />7025 Fort King Road <br />Zephyrhills, Florida 33541 <br /> <br />REFERENCE: Vema Hudson Lewis, Lot 22 Phase 1, New Home Construction <br /> <br />Dear Silver Oaks Realty, <br /> <br />I received the Silver Oaks Design Review Application in the mail on November 10, 2000. <br />I have reviewed the seven (7) -page applications along with several other members of the <br />Design Review Committee. After careful review of the plans for new home construction <br />on lot number 22, Phase 1 of Silver Oaks, the Design Review Committee has approved <br />the floor site plans for construction here in Silver Oaks. <br /> <br />The Design Review Committee will retain the original application for its records. If you, <br />Ms. Lewis or any member of Bill Poe Construction, Incorporated have any other <br />questions regarding this matter, please feel free to contact me at 780-6340. <br /> <br />Again, we appreciate you cooperation in submitting the application to the Design Review <br />Committee. <br /> <br />Thank, you, /! <br />/ rp-C? <br />~, <br /> <br />Jeffrey Collins <br />Chairman, Design Review Committee <br /> <br />~~ <br />Fred Allen, DRC <br /> <br />~ <br />Danny urgess, DRC <br /> <br />~J~L/ <br /> <br />Cc/Design Review Committee 2000-026 <br />