Laserfiche WebLink
<br />3. Contractor shan be responsible for supervision, coordination of its sub-trades, and all actions <br />reasonably required to complete the Work even if not specifically shown in the plans and specifications <br />but can be reasonably inferred. <br /> <br />4. Contractor shall provide technical services as required or specified to effect the operation of equipment <br />and/or mfttenld fllmi!l.herl under thi!l; Agreement, including perfonnance of specific testina. if any, and <br />shall instruct the Owner's personnel in the operation, maintenance and control of such equipment. <br /> <br />.5- Contractor acknowledges its requirement under this Agreement to coordinate its Work with services, <br />materials and/or equipment to be furnished by others to ensure a completely compatible system. <br />Accordingly, the Contractor shall review the existing conditions and the product data of all items <br />requiring integration's and compatibility with the Work required hereunder. <br /> <br />6. Subcontractor shall be liable for any damages to adjacent surfaces caused by its Work, either <br />accidentally or through negligence. <br /> <br />7. Contractor shall provide and be responsible for layout. including the accuracy thereof. necessary for <br />the performance of its Work required.. <br /> <br />8. Contractor shall perform all cutting. fitting. patching, sleeving. grouting and sealing oCtile Work that <br />may be required to fit it to, receive, or be received by the Work of others shown upon, or reasonably <br />implied by, the Contract Documents. <br /> <br />9. This Agreement if for the construction/installation of a complete functioning system OT systems, <br />complete with all interfaces, interconnections and coordination required to cause the Work of this <br />Agreement to function in bannony with all other aspects of the Project. <br /> <br />10. The Contractor may at any time order the teinporary suspension of the work to be performed herein. <br />Additionally, if the Owner shall at any time order the suspension of the work, the Contractor may order the <br />Subcontractor to suspend until such time as the Owner orders the Contractor to proceed. The Contractor <br />shall not be liable and the Subcontractor shall have no claim for damages for any delay, suspension or <br />interruption of the work caused by any reason. The Subcontractor's sole right and remedy for delay in <br />the work for any case shall be the right to request an extension of time to complete the work for any <br />case shall be the right to request an extension of time to complete the work and such request must <br />be in writing within 10 days of the commencement of the cause of such delay. Such request should <br />specify the alleged conditions and causes of the delay and indicate the amount of time extension required.. <br />The determination of granting such extension shall be at the sole discretion of the Contractor. <br /> <br />11. The Contractor shall employ only such labor as will not cause delays, stoppages or strikes upon the work <br />to be performed by any of tile trades working on or about the site. <br /> <br />12. Upon the Owners request. the Contractor shall immediately furnish a bond executed by it with a fidelity OT <br />surety company authorized to transact business in the State of Florida, in form and amount satisfactory to the <br />Owner, guaranteeing the faithful perfonnance of this Contract and the prompt payment of all claims of its <br />laborers and material men. <br />