My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0272
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:42:47 PM
Creation date
10/3/2006 10:57:12 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0272
Building Department - Name
BONUS DOLLAR STORES
Address
GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION III - SCREW SPLINE (Continued) <br /> <br />Step C: Apply sealant to the upstanding leg on the flashing. (See FIG. 4). <br /> <br />Step 0: If there is an entrance, the entrance frame and attached sidelight unit(s) should be installed first <br />being careful to locate it accurately in the opening. Fasten to surround through the glazing pocket <br />and threshold using appropriate fasteners. <br /> <br />Step E: Install the framing units starting at the entrance and working towards the end(s). If there is no <br />entrance start at one jamb then work toward the other. <br /> <br />Step F: The first unit should be attached to the surround at the head, sill, and jamb. (See STEP I). <br />The remaining units are installed by snapping together the female mullion half with the male half of <br />the adjacent unit. (See FIG. 7). <br /> <br /> <br />FIG. 7 <br /> <br />/00 <br />~~---- <br />t.ij <br />!l <br /> <br />NOTE: MULLIONS ARE <br />NOT DESIGNED TO <br />BE UNSNAPPED AFTER <br />INSTALLATION. <br /> <br />NOTE: APPLY SEALANT TO THE ENDS OF THE HORIZONTAL <br />MEMBERS TO ASSURE A SEAL AT THEIR POINT OF CONTACT <br />WITH THE FEMALE MULLION HALF. <br /> <br />Step G: The last unit should be pivoted into position using the last installed mullion half as a pivot point. With <br />narrow units (under 4') the last two units should be snapped together and installed as a single unit. <br /> <br />FIG. 8 <br /> <br />// \ [8 <br />/ ;, <br />/ /' <br />~ <br /> <br />// <br /> <br />Step H: By snapping mullion halves together as frame is <br />assembled, frame can be installed as one <br />unit. Guide horizontals over shear blocks on door <br />jamb and install unit into place (FIG. 8). <br /> <br />t. <br /> <br /> <br />Stept: <br /> <br />Insert shims as needed at head and jambs and anchor through the glass pocket. (See FIG. 6). <br />Fasteners should be within 6" (152mm) of mullions on each side and 24" (609mm) a.c. in between. <br />Countersink all screw heads. Seal fasteners at sill. (See FIG. 9). <br /> <br />NOTE: If heavy mullion or steel reinforcing is used, extra perimeter fasteners may be required to <br />handle larger loads. Consult Area Application Engineering Dept. <br /> <br />10 <br /> <br />. <br /> <br />. <br /> <br />IJ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.