Laserfiche WebLink
<br />IKawneer <br /> <br />TRIFAB@450 <br />SPECIFICATIONS <br /> <br />C1/B <br />1A <br /> <br />PART 1 - GENERAL <br /> <br />Furnish all necessary materials, labor and equipment for the complete in- <br />stallation of aluminum framing as shown on the drawings and specified <br />herein. <br /> <br />1.01 Summary <br />A. Section Includes: <br />1. Aluminum Doors and Frames <br />B. Products Supplied But Not Installed Under This Section: <br />C. Products Installed But Not Supplied Under This Section: <br />D. Related Sections: <br />1. Glass: As specified in Section 08000. <br />E. Pre-Qualified Installers: <br />1. Installer shall be a company specializing in installation of Aluminum <br />Glazing Systems with a minimum of three (3) years. <br /> <br />1.02 References <br /> <br />A. General: <br />B. American Society for Testing and Materials (ASTM): <br /> <br />1.03 Definitions <br /> <br />1.04 System Description <br /> <br />A. Design Requirements: <br />1. Design Criteria/Concept: Trifab 450 is a framing System that provides <br />for flush glazing on all sides without projecting stops, with glass in the <br />center of the frame. <br />B. Performance Requirements: <br />1. Limit air leakage through assembly to [.06] CFM/min/sq. ft. (.0003m3/sm2) <br />of wall area at [6.24] PSF (300 Pal as measured in accordance with <br />ASTM E 283. <br />2. Water leakage: None, when measured in accordance with ASTM E 331 <br />with a test pressure difference of [8] PSF (384 Pal. <br />3. Limit mullion deflection of [U175] with full recovery of glazing materials. <br /> <br />1.05 Submittals <br />A. General: Prepare, review, approve, and submit specified submittals in ac- <br />cordance with "Conditions of the Contract" and Division 1 Submittals <br />Sections. Product data. shop drawing, samples. and similar submittals <br />are defined in "Conditions of the Contract:. <br />1. Submittal Purpose: <br />2. Non-Requested Submittals: <br />3. Architect's Review: <br />B. Product Data: Submit product data for each type of product specified. <br />C. Shop Drawings: Submit shop drawings showing layout, profiles, and <br />product components, including anchorage, accessories, finish colors <br />and textures. <br />D. Samples: Submit verification samples for colors. textures. <br />E. Quality Assurance/Control Submittals: <br />1. Design Data: <br />2. Test Reports: Submit certified test reports showing compliance with <br />specified performance characteristics and physical properties. <br />3. Certificates (Qualification Data): Submit product certificates signed by <br />manufacturer, certifying materials comply with specified performance <br />characteristics and physical requirements. <br />a. Option: Submit certificates in lieu of test reports. <br />4. Manufacturer's Instructions: <br /> <br />LITHO IN U.SA. AUGUST <br /> <br />1.06 Quality Assurance <br />A. Qualifications: <br />1. Installer Qualifications: Installer shall be a company specializing in in- <br />stallation of Aluminum Glazing Systems with a minimum of three (3) <br />years. <br />2. Manufacturer's Qualifications: Manufacturer capable of providing field <br />service representation during construction, approving acceptable in- <br />staller and approving application method. <br />3. Framing Systems and entrance doors shall be the product of a single <br />manufacturer. <br />S. Regulatory Requirements: <br />C. Certificates/Certifications: Certify that [Trifab 450 Framing System] meets <br />or exceeds performance specified in 1.04. <br />D. Field Samples: <br />E. Pre-Installation Meetings: Conduct pre-installation meeting to verify <br />project requirements, substrate conditions, manufacturer's installation <br />instructions, and manufacturer's warranty requirements. <br /> <br />1.07 Delivery, Storage, and Handling <br /> <br />A. Ordering: Comply with manufacturer's ordering instructions and lead time <br />requirements to avoid construction delays. <br /> <br />B. Packing, Shipping, Handling, and Unloading: Deliver materials in manu- <br />facturer's original, unopened, undamaged containers with identification <br />labels intact. <br /> <br />C. Acceptance at Site: <br /> <br />D. Storage and Protection: Store materials protected from exposure to harm- <br />ful weather conditions and at temperature conditions recommended by <br />manufacturer. <br /> <br />1.08 Project Conditions/Site Conditions <br /> <br />A. Environmental Requirements/Conditions: <br />B. Field Measurements: Verify actual measurements/openings by field mea- <br />surements before fabrication; show recorded measurements on shop <br />drawings. Coordinate field measurements, fabrication schedule with con- <br />struction progress to avoid construction delays. <br /> <br />1.09 Sequencing and Scheduling <br /> <br />1.10 Warranty <br /> <br />A. Project Warranty: Refer to "Conditions of the Contract" for project war- <br />ranty provisions. <br /> <br />B. Manufacturer's Warranty: Submit, for Owner's acceptance. manufactur- <br />er's standard warranty document executed by authorized company offi- <br />cial. Manufacturer's warranty is in addition to. and not a limitation of. other <br />rights Owner may have under the Contract Documents, <br /> <br />1.12 System Startup/Owner's <br />Instruction/Commissioning <br /> <br />1.13 Maintenance <br /> <br />C KAWNEER COMPANY. INC.. 1994 <br />