Laserfiche WebLink
<br />COMPLIANCE <br />CHECK <br />401.------GLAZING--ZONE 1--------------------------------________________v_ <br />Elevation Type U SC VLT Shading Area(Sqft)I <br /> <br />-------------- ----------, <br />1 <br />1.31 .87 .9 None 601 <br />1.31 .87 .9 None 61 <br />Total Glass Area in Zone 1 = 66) <br />Total Glass Area = 661 ~ <br />402.------WALLS--ZONE 1---------_______________________________________1___ <br />Elevation Type U Insul R Gross(Sqft)I <br /> <br />----- ------- --------___1 <br />I <br />24 "oC/5/8 "Gyp 0.151 4 520) <br />24"oC/5/8"Gyp 0.151 4 5201 <br />24"oc/5/8"Gyp 0.151 4 3201 <br />24 "oC/5/8 "Gyp 0.151 4 320) <br />Total Wall Area in Zone 1 = 1680) <br />Total Gross Wall Area = 1680) ,......... <br /> <br />403.------DOORS--ZONE 1---------_______________________________________1___ <br /> <br />Elevation Type U Area(Sqft)) <br /> <br />--------- ------------------------------------------ ----- ----------) <br /> <br />West 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 21) <br />East 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 21) <br />Total Door Area in Zone 1 = 42) <br />Total Door Area = 42) ~ <br />f04.------ROOFS--ZONE 1--------________________________________________)___ <br />type Color U Insul R Area(Sqft)) <br /> <br />------ ----- ------- ----------, <br />, <br />Medium 0.027 30 26001 <br />Total Roof Area in Zone 1 = 26001 <br />Total Roof Area = 2600 I V <br />05.------FLOORS-ZONE 1--------________________________________________)___ <br />'ype Insul R Area(Sqft) ) <br /> <br />------- -------___' <br />, <br />o 2600) <br />Total Floor Area in Zone 1 = 2600) <br />Total Floor Area = 2600: ~ <br /> <br />D6.------INFILTRATION__________________________________________________1___ <br /> <br />~CHECKI <br />1 1 <br />I 1 <br /> <br />BUILDING ENVELOPE SYSTEMS <br /> <br />--------- <br /> <br />--------------- <br /> <br />West <br />North <br /> <br />Commercial <br />Commercial <br /> <br />--------- <br /> <br />-------------------------------- <br /> <br />West <br />East <br />North <br />South <br /> <br />8 "CMU/3/4 "ISO <br />8"CMU/3/4"ISO <br />8 "CMU/3/4 II ISO <br />8 "CMU/3/4 "ISO <br /> <br />Btwn <br />Btwn <br />Btwn <br />Btwn <br /> <br />------------------------------------ <br /> <br />ihngl/l/2 "WD Deck/WD TruSS/9" B <br /> <br />lab on Grade/Uninsulated <br /> <br />----------------------------------------------- <br /> <br />Infiltration Criteria in 406.1.ABCD have been met. <br /> <br />MECHANICAL SYSTEMS <br /> <br />'----------------------------------------------------------------'-____1___ <br />I I <br />HVAC load siZing has been performed. (407.l.ABCD) : I v' <br />17.------COOLING SYSTEMS-----__________________________________________)___ <br />Type No Efficiency IPLV Tons I <br /> <br />---------------------------- ---------- ----- --------------, <br />I <br />. Air Cooled ( >= 65.000 Btu/h 1 9.2 9.2 7.501 v' <br />8.------HEATING SYSTEMS-----__________________________________________1___ <br />Type No Efficiency BTU/hrl <br /> <br />-------------------------------- ---------- ------------__1 <br />, <br />Electric Resistance 1 .98 54000: v' <br /> <br />3.------VENTILATION-__________________________________----------------)--- <br /> <br />) CHECK) <br />Ventilation Criteria In 409.l.ABCD have been met. :: v' <br />).-----AIR DISTRIBUTION SYSTEM-----___________________________________1___ <br /> <br />CHECK <br />