My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0307
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:42:39 PM
Creation date
10/3/2006 11:45:34 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0307
Building Department - Name
HUMPHRIES,JAMES
Address
10TH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROPOSAL <br />RYMAN CONSTRUCTION, INe. <br />(ROOFING AND ALUMINUM DIVISION) <br />37325 S.R. 54 WEST <br />ZEPHYRHILLS, FL 33541 <br />PHONE: 813-782-6094 LICENSE: RCOO6164R k T B P rf d A <br />osal Submitted To: \Afar 0 e e orme t: <br /> <br />Pro <br /> <br />Name f'.\ 2, W(A, Y\It~ <br />Street _58; 30 ~ l O..&z1 CLu-e- <br />City 2-{) ~ ~ State <br />Phone ~~~- 8QO <br /> <br />Street <br /> <br /> <br />City <br /> <br />Date of Plans <br /> <br />Oa\ <br /> <br /> <br /> <br />~ktt <br />~2fv~~ <br /> <br />State <br /> <br />Architect <br /> <br />We hereby propose to furnish the materials and perform the labor necessary for the completion of <br />7 ..~::~ - D(P ~Lf - ~ <br /> <br />] .) Complete tear-off of existing shingles. <br />2.) Roof dried in with 15 lb, felt. <br />3.) Install all new valley metal with galvanized metal. <br />4.) Installation of all new lead boots through roof <br />5.) Installation of new drip edge around perimeter. <br />6.) Ins41llation ofnew~ year fungus-resistant shingles. <br />7.) AU debris removed from the job site. <br />8.) All materials and labor furnished. <br />16~t; 9.) ~'ear leak warranty. <br /> <br />PAYMENT DUE ON COMPLETION OF JOB. <br /> <br />12..-s~.' <br />t. - ~<S)t 1 '(~ t\) ~ <br />l~~~~ <br /> <br />ti 'Z}v <br />TOi AL Bmi I b 4 (] .:-- <br /> <br />EXTRA'S: Bad plywood replaced at a cost of$40.00 per sheet. <br /> <br />EXTRA'S: Installation of new 2" x 4" lumber and 1" x 6" fascia or any other wood work <br />to be replaced on a time and material basis, at a labor cost of$30,OO per hour, <br />per man. <br /> <br />All material is <br />specifications <br /> <br />guaranteed to be as specified, and the above work to be performed in accordance with the drawings and <br />submitted for above work and completed in a substantial workmanlike manner for the sum of <br />Dollars [$ (bqOo~J. <br /> <br />with payments to be made as follows: _ P Q..LA-._..."'O ~ () ..~.It7'lo ~ <br />--(\~ .........r...~ <br /> <br /> <br />Any alteration or deViation from above specifications involving extra <br />costs. will be executed only upon written orders. and will become an <br />extra charge over and above the estimate, All agreements contingent <br />upon strikes. accidents or delays beyonc our control. Owner to Carry <br />fire. tornado and other necessary insurance upon above work, Wor,- <br />men's Compensation and Public Liability Insurance on above work to be <br />taken out by <br /> <br />,-- <br /> <br />~~~~ <br /> <br />Note-This proposal may be withdrawn by us if not accepted <br />within days. <br /> <br />ACCEPTANCE OF PROPOSAL <br />The above prices. specifications and conditions are satisfactory and are hereby accepte <br />Payment will be made as outlined above. <br /> <br />Date i <br /> <br />Signature <br /> <br /> <br />./' <br />!Y <br /> <br /> <br />Signature <br /> <br />ORIGINAL <br /> <br />O{lU'?~F-d <br />
The URL can be used to link to this page
Your browser does not support the video tag.