My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0354
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:42:27 PM
Creation date
10/3/2006 2:27:07 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0354
Building Department - Name
E P M C
Address
GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PAGE: 1 <br /> <br />OF: 1 <br /> <br />ACTS CONSTRUCTION, I NC,DATE: 4/24/01 <br /> <br />SPECIALIZING IN THE PETROLEUM INDUSTRY PAYMENT TERMS <br />P,O. BOX 68_0427 <br />ORLANDO, FLORIDA 32868 <br />(4071578 - 4822 I.A~~~~ REP: Sene Snow <br /> <br />State License #CGC 008402 PCC 045038 <br /> <br />- Upon Receipt <br />of Invoice <br />VALID FOR 30 DAYS <br /> <br />TO: Harper Mechanical <br />: 5401 Benchmark Lan~ <br />: Sanford, FL 32773 <br /> <br />LOCATION: East Pasco Medical Center <br />: Z e ph y rh i 11 s, FL <br /> <br />. <br />. <br /> <br />. <br />. <br /> <br />ATTN: Gene Sikes <br />FAX: 407-323-7007 <br /> <br />. <br />. <br /> <br />PHONE: 407-321-8100 <br />QUOTATION AND CONTRACT: S-353 <br /> <br />REFERENCE: We are pleased to submit proposal ,as follows: <br /> <br />1. Obtain necessary tank installation permits. <br /> <br />2. Excavate and install 1-15,000 gallon doublewall fiberglass fuel tank per <br />plans and specifications. <br /> <br />3. Haul off excess fill dirt and debris. <br /> <br />4. Furnish and install fuel piping per plans and specifications. <br /> <br />5. Furnish and install Veeder Root Electronic Tank Gauge. <br /> <br />NOTE : <br />No Provision For Unknown Underground Obstructions. <br />No Day Tank. No Fuel. No Concrete at Grade. <br />No Asphalt Paving or Sidewalk Repairs. <br />No Electrical Power or Control Wiring. <br />No Sheet Piling or Shoring. <br />If Necessary to Wellpoint Add $ 3,200.00 ( Initial if Accepted) <br />If Deadmen Tank Anchors Are Used In Lieu of Concrete Slab Deduct $ 3,000.00 <br /> <br />TOTAL: $ 86,622.00 <br /> <br />AUTHORIZED SIGNATURE <br /> <br />Please sign acknowledgemenl and retum copy at lOOn . poa.__. <br />ACCEPTANCE: Thil pt'OpOsaJ, when accepted by the Purchaaer. <br />and final approval of Sallen OfficIal Office, wit Cl:InatItUl' a bonaIId. <br />contract betwe,n UI, IUb/let to a" term. and COndlUon, on th. <br />reverse aidl. It iI expra,.1y agreed that th.,. ar. no ptamiae,. <br />agreements, or understanding" oral or wrinln. not 'PICifIId In ttUa <br />proposal. <br /> <br />oo~~ ~~ <br /> <br />ACCOUNT MANAGER <br />
The URL can be used to link to this page
Your browser does not support the video tag.