My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0363
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:42:25 PM
Creation date
10/3/2006 2:31:05 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0363
Building Department - Name
BALDO,NANCY
Address
12TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ J. OVe; Allow $2,000.00 tor constrUcting a concrete driveway or parking pail .;ICfpending on Slt~ ana <br />setback conditions, also entrance platforms and steps as indicated, and the front Porch conC'.tete <br />slab floor. <br /> <br />......r6ro Paint interior (one color) and aU stucco, wood, ferrous metaJs exposed to the exterior. <br />it'.CCI <br />,DC'" Allow $1, 0:00 for sodding and seeding. SOdding, planting, and seeding locations to be <br />determined. <br /> <br />; 0 U Make all necessary utility connections, <br /> <br />.} 00 Incluc:le all costs for clean.up and required insurances. <br /> <br />90 <br /> <br />. . <br /> <br />91 <br />92 <br /> <br />~~. 'Od <br /> <br />TOTAL. PROJECT: <br /> <br />$ <br /> <br />~ G, ODO t ~ 0 <br /> <br />THE FOLLOWING AODITIONAL WORK MAY BE REQUIREO AT CERTAIN SITES. STATE ADDITIONAL-COSTS, IF <br />REQUIRED, FOR THE FOlLOWING WORK ITEMS SHOULD THEY APPLY TO THE PROJECT: . <br /> <br />1. Ttee and stump removal. <br />2. . If deed restrictions or codes require underground electric service, the <br />added cost of this service. <br />3. Work assumes connection to public water supply with required meter and <br />all fees. Verify water location with City/County. Added cost for the need <br />for a wellincfuding all pennits, fees, connections, and equipment. <br />4. Work assumes connection to a public sewer and all required fees. <br />Verify sewer location with City/County. Added cost for the need for <br />a septic tank and field where public sewer facilities are not available. <br />5. Monolithic footings as indicated are assumed. Addeo cost for stem wall <br />and spread footings if required by site conditions. <br />6. Impact fees. . <br />7. . Building pennlt (varies with locality). <br /> <br />(.' <br />1J"- <br /> <br />Otl.-\O Q.kl~rl"'4. f-(I)US,- <br /> <br />TOTAL ADDEO COSTS: <br /> <br />TOTAL PROJECT INCLUDING ADDEO COSTS: <br /> <br />R:\PHlll.~PI\PASCO\NewRiverRevisecl 05- ~ O-OOWW.doc <br /> <br />$ . <br /> <br />$ <br /> <br />$ <br /> <br />$ <br />$ <br />$ <br />$ 700.... <br /> <br />$ f"l '00- <br /> <br />$ !> t'f I) DO . 0 (;) <br /> <br />Revised May 10, 2000 pag, ~ of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.