Laserfiche WebLink
<br />BUILDING PERMIT <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788.6611 <br /> <br />Permit <br /> <br />00018 <br />I/l/.o\ <br /> <br />Date <br /> <br />BU~G <br /> <br />EL~RICAL <br /> <br />2~. ~ <br />PLUMBING <br /> <br />MECH\.NICAL <br /> <br />Sewer Conn <br />Water Conn: <br /> <br />Property Owner: J cd>Q.n J"\~ ~ F '-C.", l f10.... s-e <br />Job Address: 5'~ ~ z. - /1 f'L. f+ . <br /> <br />Water Meter: <br /> <br />T,I.F.'s: <br /> <br />Parcell.D, # <br />Zoning: Energy Code: <br />Description of Work ~ -fer (,'.., ~ ( <br /> <br />Radon Gas: <br /> <br />FINAL <br />C.O. <br /> <br />DATE <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances, <br /> <br />DATE <br /> <br />City License Registration # <br />State Certified License# <br /> <br /> <br />Inspector <br /> <br />Valuation or <br />Contract Price <br /> <br />,..:) Telephone# 171- 90 f.: 7 <br /> <br />wIVE< <br /> <br />UILDING <br /> <br />EL CTRICAL <br /> <br />PLUMBING <br /> <br />ME <br /> <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM, <br />Insul. CL <br />WL <br /> <br /> <br />Tp. Servo <br />Rough In <br />Meter Can <br /> <br />Const. Pole <br />Pool <br /> <br />Pre-Meter <br />Final <br /> <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($ 25,00) shall be made for each trip for each trade: <br /> <br />a, Wrong Address <br />b, Condemned work resulting from faulty construction. <br />c. Repairs or corrections not made when inspection called, <br />d, Work not ready for inspection when called. <br />e, Permit not posted on job site, <br />f, Plans not at job site. <br />g, Work not accessible, <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />