Laserfiche WebLink
<br />November 22,2000. <br /> <br />Sheet E-2 - ELECTRICAL ONE LINE AND SCHEDULES <br /> <br />1. Add essential branch names to the one line diagram as shown on Sheet E-2, Delta 5, dated <br />November 22, 2000. <br /> <br />Sheet E-5 - POWER & SYSTEMS FIRST FLOOR PLAN <br /> <br />1. Add fire alarm visual devices as shown on Sheet E-5, Delta 5, dated November 22,2000. <br /> <br />Sheet E-7 - ELECTRICAL ROOF PLAN <br /> <br />1. Add cross roof conductor and mid roof air terminal as shown on Sheet E-7, Delta 5, dated <br />November 22,2000. <br /> <br />MECHANICAL <br /> <br />SHEET M-4 - FIRST FLOOR PLAN - HV AC: <br /> <br />1. Add a note requiring construction areas to be maintained under a negative pressure as shown <br />on sheet M-4, Delta 5 dated November 22, 2000. <br /> <br />SHEET M-6 - SECOND FLOOR PLAN - HV AC: <br /> <br />1. Add a note requiring construction areas to be maintained under a negative pressure as shown <br />on sheet M-6, Delta 5 dated November 22,2000. <br /> <br />2. Add return air ductwork as shown on sheet M-6, Delta 5, dated November 22, 2000. <br /> <br />3. Add supply and return air ducts to Vestibule 2-113 as shown on sheet M-6, Delta 5, dated <br />November 22,2000. <br /> <br />SHEET M-8 - THIRD FLOOR PLAN - HV AC: <br /> <br />1. Add detail DQ-20A as shown on sheet M-8, Delta 5, dated November 20, 2000. <br /> <br />PLUMBING <br /> <br />SHEET FP-4 - SECOND FLOOR PLAN - FIRE PROTECTION: <br /> <br />REVISION NO.5 <br /> <br />PAGE 2 <br /> <br />JOB NO. 99087.00 <br />