My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0152
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:43:15 PM
Creation date
10/13/2006 9:00:31 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0152
Building Department - Name
CAPSTONE CAPITAL
Address
GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. .~}- <br />~o ~1t}~~~N~~RI <br />O~ 0/ ~v <br />~\) <br />V~~'<? <br /> <br />10221 Hwy 301 <br /> <br />Dade City FL 33525 (352) 567-1349 <br /> <br />SCOPE OF WORK <br /> <br />Remodel of Senior Activitv Center for Pasco Relrlonal Hospital <br /> <br /> <br />Provided to the City of Zephyrhills Building Dept. <br /> <br />A. Wall between businessffice and current Senior's Activi area <br />1. Penetrate wall and insWI 3' -6" x 6' -8" One hour fire rated metal door, meW <br />frame, and hardware similar in design to existing hardware and keyed accordingly. <br />2. Repair and patch floor area. <br />3. Paint door and jamb same color as surrounding wall. <br />4. Repair drywall and paint in area of penetration as necessary. Paint to match as <br />close as possible. <br /> <br />ew Exam Room 7 <br />1. Remove existing carpeting <br />2. Cut concrete floor for sewer line tap and plumb for exam room sink. <br />3. Run hot and cold water line overhead. <br />4. Build wall out 3 W' at cabinet area to allow plumbing chase. <br />5. Patch floor where cut. <br />6. Paint entire room (one coat on existing painted surfaces, primer plus two coats on <br />new drywall) <br />7. Install 110 volt GFI receptacle at cabinet location <br />8. Install exam room cabinets. <br />9. Install exam room sink and fixture trim, matching existing hardware as close as <br />possible. <br />10. Install VCT type flooring and new cove base. <br />11. Room left broom clean <br /> <br />C and D New Exam Room~ 8 and 9 <br />1. Remove existing carpdting <br />2. Cut concrete floor for sewer line tap and plumb for exam room sink. <br />3. Run hot and cold water line overhead. <br />4. Patch floor where cut. <br />5. Patch drywall as requined <br />6. Paint entire room (one coat on existing painted surfaces, primer plus two coats on <br />new drywall) <br />7. Install 110 volt GFI receptacle at cabinet location <br />8. Install exam room cabinets. <br />9. Install exam room sinld and fixture trim, matching existing hardware as close as <br />possible. <br />10. Install VCT type flooting and new cove base. <br />I <br />11. Room left broom cleajn <br />I <br />I <br /> <br />Site De~elopment <br />I <br /> <br />General Contractor <br /> <br />Custom Homes <br /> <br />Steel Buildings <br /> <br />DeslgnlBulld <br /> <br />Off: (352)567-1349 <br /> <br />Fax: (352)567-7459 <br /> <br />Lic# CGC 043354 <br />
The URL can be used to link to this page
Your browser does not support the video tag.