Laserfiche WebLink
<br />BUILDING PERMITN~ <br /> <br />0173 <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788.6611 <br /> <br />10.C>~ \ \ <br />BUILDING ELEC~ICAL PLU~G <br /> <br />Property Owner: ~ (. ~ 41 ~ L~1'l1e <br />Job Address: Lo.\- ?J' t:"",~ r ~ 'cd PO; "" -4-e <br /> <br />Permit <br /> <br />Date <br /> <br />') IS/Of <br />. <br /> <br />MEC~ICAL <br /> <br />Sewer Conn <br /> <br />Water Conn: <br /> <br />Water Meter: <br /> <br />T.I.F.'s: <br /> <br />Parcel I. D. # <br />Zoning: Energy Code: <br />Description of Work _D r f V e w Ct.1 <br /> <br />Radon Gas: <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />FINAL <br /> <br />DATE <br /> <br />Complete Plans. Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />c.o. <br /> <br />DATE <br /> <br />Inspector <br /> <br />Permit Fee <br />Signature <br />Company <br />Address <br />Telephone# <br /> <br />itIL~ <br /> <br />Valuation or I """'\ D oU <br />Contract Price-, I 0.'- <br /> <br />City License Registration # <br />State Certified License# <br /> <br />"1~~ )~ tJ <br /> <br />Ty~C1t"'\ <br /> BUILDING EL TRICAL <br />Ftr. Tp. Servo <br />Pre sui' Rough In <br />Lintel Meter Can <br />FRM. Const. Pole <br />Insul. CL Pool <br />WL Pre-Meter <br /> Final <br />Driveway .1f,:?-O{ s-tt <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Twenty Five and 00/100 Dollars ($25.00) shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />C. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />