Laserfiche WebLink
<br />__.__>___ .,__ '____-'">:,.~_._h_.,.~.~_'._......_._.__, .'_ __ _,_~_____"_._ _~..._..'_'.~__..~ ____~.._. ...._ ___ <br /> <br />SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT <br />ENVIRONMENTAL RESOURCE <br />STANDARD GENERAL CONSTRUCTION <br />PERMIT NO. 44021279.000 <br /> <br />I EXPIRATION DATE: December 21, 2005 <br /> <br />I PERMIT ISSUE DATE: December 21,2000 <br /> <br />This permit issued under the provisions of Chapter 373, Florida Statutes (F.S.), and Florida Administrative <br />Code (FAC.), Rule 400-40, authorizes the Permittee to perform the work outlined herein and shown by the <br />application, approved drawing(s), plans, and other documents, attached hereto and kept on file at the <br />Southwest Florida Water Management District (District). All construction, operation and maintenance of the <br />surface water managementsystern authorized by this permitshall occur in compliance with Florida Statutes <br />and Administrative Code and the conditions of this permit. <br /> <br />.. <br /> <br />PROJECT NAME: <br />GRANTED TO: <br /> <br />Sun State Aluminum <br /> <br />Sun State Aluminum, Inc. <br />37528 SR 54 West <br />Zephyrhills, FL 33541 <br /> <br />ABSTRACT: This permit authorizes construction of a new surface water management system serving a <br />2.27 acre commercial development known as Sun StateAluminum. The project is located off US 301, one- <br />half mile south of SR 54 in Zephyrhifls.. in Pasco County: <br /> <br />The project is located within a closed drainage basin. The stormwater management system is designed <br />for a 100-year, 24-hour rainfall event of 12.0 inches, for volume retention. The project engineer used the <br />SCS Type II Florida-modified rainfall distribution and a unit hydrograph shape factor of 256 to generate <br />runoff hydrographs. Flow attenuation routings were initiated at the 36-hour drawdown elevation of the <br />treatment volume for each pond. The required 1 OO-year retention volumes were also initialized at the same <br />elevation. The proposed surface water management system will be comprised of one dry retention pond. <br />Project 'runoff will be discharged to the adjacent low area as presently occurs. The drainage-calculations <br />indicate the pond is sizedtoretain the 100-yearpost.;.minus, pre-developmentrunoffvolume. The pond will <br />be equipped with a discharge structure sized to attenuate post-development peak discharges from the 25- <br />year, 24-hour storm. <br /> <br />Compliance with water quality requirements is assured, as the on-line- detention pond is sized to retain and <br />infiltrate one-half inch of runoff from its contributingwatershed, in no longer than 72 hours. The discharge <br />structure will be equipped with a skimmer to ensure that oils~ greases and' floating pollutants are not <br />discharged into receiving waters. There are no wetlands withinttJe. project area. <br /> <br />The Engineer of Record, William F. Carter, Florida P.E. No. 41852, has submitted design calculations and <br />construction drawings which indicate no adverse off-site water quality or water quantity impacts are- <br />anticipated to result from this development. The surface water management system. will be owned,. <br />maintained and operated by the Permittee" Therequired legal documents are part of the file of record for <br />this project. . , <br /> <br />OP. & MAlNT. ENTITY~ <br />PROPERTY LOCATION: <br />SECITWP/RGE: <br /> <br />Sun State Aluminum, Inc.. <br /> <br />Pasco County <br /> <br />2, 3/26S/21 E <br /> <br />TOTAL ACRES OWNED <br />OR UNDER CONTROL: <br /> <br />2.27 <br /> <br />