<br />5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the <br />Work as of the end of the period covered by the Application for Payment. <br /> <br />5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress pay- <br />ment shall be computed as follows: <br />.1 Take that portion of the Contract Sum properly allocable to completed Work as deter- <br />mined by multiplying the percentage completion of each portion of the Work by the <br />share of the Contract Sum allocated to that portion of the Work in the schedule of val- <br />ues, less retainage of Ten percent ( 1 0 %). Pending final determi- <br />nation of cost to the Owner of changes in the Work, amounts not in dispute shall be <br />included as provided in Subparagraph 7.3.8 of AlA Document 1\2.01-1997; <br />.2 Add that portion of the Contract Sum properly allocable to materials and equipment <br />delivered and suitably stored at the site for subsequent incorporation in the completed <br />construction (or, if approved in advance by the Owner, suitably stored off the site at a <br />location agreed upon in writing), less retainage of Ten percent ( 10 %); <br />3 Subtract the aggregate of previous payments made by the Owner; and <br />.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate <br />for Payment as provided in Paragraph 9.5 of AlA Document 1\2.01-1997. <br /> <br />5.1.7 The progress payment an10unt determined in accordance with Subparagraph 5.1.6 shall be <br />further modified under the following circumstances: <br />.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total pay- <br />ments to the full amount of the Contract Sum, less such amounts as the Architect shall <br />determine for incomplete Work, retainage applicable to such work and unsettled claims; <br />and (Subparagraph 9.8.5 of AlA Document 1\201-1997 requires release of applicable retainage upon <br />Substantial C;ompletion of Work with consent of surety, if any.) <br />.2 Add, if final completion of the Work is thereafter materially delayed through no fault of <br />the Contractor, any additional amounts payable in accordance with Subparagraph 9.10.3 <br />of AlA Document 1\2.01-1997. <br /> <br />5.1.8 Reduction or limitation of retainage, if any, shall be as follows: <br />(If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting <br />from the percentages inserted in Clauses 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the <br />Contract Documents, insert here provisions for such reduction Of' limitation.) <br /> <br />5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments <br />to suppliers for materials or equipment which have not been delivered and stored at the site. <br /> <br />5.2 FINAL PAYMENT <br />5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made <br />by the Owner to the Contractor when: <br />.1 the Contractor has fully performed the Contract except for the Contractor's responsibil.. <br />ity to correct Work as provided in Subparagraph 12.2.2 of AlA Document 1\2.01-1997, and <br />to satisfy other requirements, if any, which extend beyond final payment; and <br />.2 a final Certificate for Payment has been issued by the Architect. <br /> <br />WARNING: Unllamsed photocopying violates u.s. copyright laws and will subject the violator IV legal prosecution. <br /> <br />I <br /> <br />8111 <br /> <br />~. .0 <br />0. .0 <br />0'.'.-.'0 <br />o a:::n ~ <br />.:::::=::J <br /> <br />~1997 AlAe <br />AlA DOCUMENT A101-1997 <br />OWNER-CONTRACTOR <br />AGREEMENT <br /> <br />The American Institute <br />of Architects <br />1735 New York Avenue, N.W. <br />washington. D.C. 20006-5292 <br />