Laserfiche WebLink
<br />Ryman Construction <br />Lot #6 Highland Loop <br /> <br /> SQ. FEET PRICE <br />MAIN OR LIVING: 1,325 $ 40.00 <br />OTHER AREA UNDER ROOF: 572 $ 15.00 <br />OTHER: $ - <br />VALUATION $ 61,580.00 <br />FEE SHEET $ 318.00 <br />ADDRESS $ 20.00 <br />DRIVEWAY $ 20.00 <br /> <br />BUILDING: $ 517.00 <br />CREDIT: $ - <br />BUILDING LESS CREDIT: $ 517.00 <br />ELECTRICAL: $ 82.60 <br />PLUMBING: $ 70.00 <br />MECHANICAL: $ 35.00 <br />RADON: $ 18.97 <br />TOTAL $ 723.57 <br /> <br />SEWER: $ 1,278.00 <br />WATER: $ 350.00 <br />IRRIGATION: $ - <br />TOTAL: $ 1,628.00 <br /> <br />SUB-TOTAL <br /> <br /> <br />WATER METER: <br />IRRIGATION METER <br /> <br />SIF'S: $ <br />97.5% $ <br />2.5% $ <br /> <br />1,694.00 <br />1,651.65 <br />42.35 <br /> <br />T IF'S: $ 1,480.00 <br />99% $ 1,465.20 <br />1% $ 14.80 <br /> <br />TOTAL: $ <br /> <br />5,705.57 r <br />