My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0491
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:41:53 PM
Creation date
10/18/2006 10:24:25 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0491
Building Department - Name
BADER PROSTHETICS
Address
6751 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~"\ ",",' '"~ <br /> <br />., <br />1';.;~"" I, <br />1 . <br />, , <br /> <br />, <br /> <br />SUNRISE CONSTRUCTION, INC. <br />1527 N. Dale Mabry <br />Suite 100 <br />Lutz., Florida 33549 <br />Office: (813)948-3000 Fax:(813)948-1062 <br />State License CBC 051273 <br /> <br />CONTINUED - Office <br /> <br />Prep floor for vinyl tile <br />Tile - vinyl composition <br />Vmyl cove <br /> <br />F <br />F <br />PF <br /> <br />64.00 SF <br />64.00 SF <br />29.00 LF <br /> <br />NOTES: <br /> <br />11' <br /> <br /> <br />Room: Patient R#3 <br /> <br />ClOSE-UP OPENING <br /> <br />P8tIent ~ <br /> <br />205.33 SF Walls <br />275.92 SF Walls & Ceiling <br />7.84 SY Flooring <br />34.83 LF Ceil. Perimeter <br /> <br />70.58 <br />70.58 <br />23.83 <br /> <br />SF Ceiling <br />SF Floor <br />LF Floor Perimeter <br /> <br />l' <br /> <br />Install sink (supplied by others) complete wlH&C supply lines & <br />waste arm <br />Install new metal frame cutain wall with 112" drywall each side, <br />finished & floated <br />Batt insulation- 4"-Rll 176 176.00 SF <br />Paint the walls - two coats W 205.33 SF <br />Folding door 2 2.00 EA <br />NOTE: These are (2) two stmu/ard foldillg doors iltSUll1ed together cretIIing a 5' opening. The cost for adding to this would be <br />IIJ1proximately U5. fJO/LF. <br />Tear-out glue down carpet <br />Prep floor for vinyl tile <br />Tile - vinyl composition <br />Vinyl cove <br /> <br />1.00 EA <br /> <br />22 <br /> <br />22.00 LF <br /> <br />F <br />F <br />F <br />PF <br /> <br />70.58 SF <br />70.58 SF <br />70.58 SF <br />23.83 LF <br /> <br />NOTES: <br /> <br />BADER_SCOPE <br /> <br />08/07/2001 Page: 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.