Laserfiche WebLink
<br />~ ~ f:t R~, IN;. <br />11250 S. HWY 98 Dade City, FL 33525 Phone 352-567-8580 Fax 352-567-7073 <br />State Certified CB C059817 &CC C058134 <br />Se.w~ F~'". F~ H~ ~ ~ ~ 1~~ <br />Ann: Mr. CliffMc Duffie <br />Chamber of Commerce Date: _8/2 I/O 1 <br /> <br />38550 5th Ave. <br /> <br />Phone: _782-1913 <br /> <br />Zephyrhills, FL 33540 <br /> <br />City/County _City <br /> <br />Parcel # <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />Duro Last roormg system <br /> <br />1. Barricade off work area as needed. <br />2. Remove loose debris from flat roof <br />3. Remove existing flashings and boots as required. <br />4. Check substrate decking for water damage. Replacement of decking will be done on a time and material <br />basis at the rate of$36.00 dollars per man -hour plus materials marked up a 25% contractors fee. <br />5. Install fan fold insulation, mechanically attached per Duro Last specification. <br />6. Install Duro Last membrane for a IS-year material and labor warranty. <br />7. Install new Duro Last boots, custom curb and comers as required. <br />8. Install Duro Last two-way vents as required. <br />9. Install Duro Last r Q tV 1 3/4" fascia with cover as required. <br />10. Disconnect and reconnect Ale units. Schaper Roofing will not be responsible for existing conditions of <br />the wiring, freeon lines, ductwork, electrical or the units due to the age of the units. <br /> <br />Contractor warranty Upon completion of the work and payment of all monies owed. Contractor shall issue a <br />two (2) year warranty limited to leaks caused by any component install by the contractor. Duro Last shall issue <br />a fifteen (15) warranty on workmanship and materials. <br /> <br />General Conditions All work shall be carefully supervised and completed by workmen skilled and <br />knowledgeable in the methods needed to produce high quality work. The job site shall be kept clean daily for <br />the duration of the job and the grounds shall be left clean of all roof related debris after completion. The yard <br />shall be swept with a magnet. Collection costs if any together with interest shall be added to the contract price <br />if payment default occurs. Cancellation of the contract after the 72-hour grace period may incur a nominal fee. <br />The contractor shall provide permit, Workman compensation, and general liability inSuT3.nce. Carpentry, <br />authorized change orders and work, which are not covered under the scope of work outlined herein, shall be <br />performed on a time and materials basis unless otherwise agreed upon. <br />