Laserfiche WebLink
<br />~ <br /> <br />Ryman Construction Incorporated <br />13"" 37325 S.R. 54 W. <br />dOf2 .. 6 v Zephyrhills, Florida 33541 <br />'3 '-/- 2. ~ -2. ( - a:/70 _ 0 (813) 782-0825' eBe # 035134 FAX (813) 788-6773 <br /> <br />TO: <br /> <br />/f \ L I I/' I b 11 DATE: 'i<._ "'7 -0 <br />L) &J/\ & \T 0 r ; -z.o t\ L-' \J No iJ '6€- v C:>< <br /> <br />I~ 4: ~(t€A- 6(ope- Dr. <br /> <br />z.- k-u I s 33~--y I <br /> <br />I. Complete tear-off of existing shingled roof (excluding wall flashing behind vinyl siding, metal roofs, <br />roJJed roofing) <br />2. Roof deck prepped and plywood re-secured with pneumatic nailer and twisted shanked nails. <br />3. Roof dried in with #15 felt <br />4. Installation of all new vaJJey metal and eve flashing over metal roofs attached to building. <br />5. Installation of new lead boots through the roof <br />6. Installation ofnew drip ~e around the perimeter of the roof deck. ~. f....o...k-e.. i..t...:)e.o~ ?<._ <br />7. Installation of anew OJ.::L year fungus resistant shingle. ~v <br />8. All debris removed from the grounds and roof area and properly disposed of <br />9. All gutters to be secured with original installation attachment. <br />10. All material and labor furnished. <br />11. Five-year contractor leak warranty and manufacture warranty. <br />12. Payment due upon completion <br /> <br />TOTAL BID $ /D, ()~ pC3 <br />, <br />ANY PLYWOOD NOT COVERED BY TIllS CONTRACT THAT WilL NEED TO BE REPLACE DUE <br />TO SIGHT UN SEEN WILL BE AT A COST OF $40.00 PER SHEET <br /> <br />, ANY INSTALLATION OF ANY OTHER WOOD OR EXTRA FIELD CHANGE ORDERS WILL BE <br />BILLED AT A COST OF TIME AND MATERIAL. TIME BEING $40.00 PER MAN PER HOUR AND <br />THE RET AlUL COST OF MATERIALS <br /> <br />ALL MAlERIAL IS GUARANTEED TO BE AS SPECIFIED, AND TIIE ABOVE WORK TO BE PERFORMED IN <br />ACCORDANCE WITH THE DRAWINGS AND THE SPECIFICATIONS SUBMITTED FOR ~ORK AND I ) LJ'/ '" II <br />COMPLETED IN A SUBSTANTIAL WORKMANLIKE MANNER FOR TIIE SUM o-ry-~~I N(...<.b~ ~ /~ U ~ S <br /> <br />WIlli ~ YMENT DUE AS FOLLOWS I I (II D <br />SD~ Du.,f\.. a:....~ CDo-r~ <XT COM-fkf~(J)^ RESPEC'IFULLYSUMBMITTED RY~At ~f2.- <br /> <br />TIllS PROPOSAL MAYBE WITIIDRA WN BY US IF NOT ACCEPTED WI1HIN t 5D~;- "^ 1))b t: l:. yl<.: <br /> <br />ACCECTANCE OF PRPOSAL <br />TIIE ABOVE PRICES, SPECIFICATIONS AND CONDITIONS ARE SA TISF ACTORY AND ARE HEREBY ACCEPTED. YOU <br />ARE AUTIIROIZED TO DO THE WORK AS SPECIFIE. PAYMENT WILL BE MADE AS OUTLINED ABa <br /> <br /> <br />DATE OC-~7-0 I <br /> <br />-- <br /> <br />SIG <br /> <br />:::----- <br /> <br />~ <br /> <br />PLEASE NOTE: A CHARGE OF ~% WILL BE MADE ON AlL UNPAID BALAN AFTER 30 DAYS, <br />WHICH IS AN ANNUAl PERCENTAGE RAT!: OF 18% APPLIED TO PA,S DUE BALANCES <br />