Laserfiche WebLink
<br />BUILDING PERMITN~ <br /> <br />(.-l <br />-.0 <br />00 <br />N <br />("') <br />::J: <br />.... <br />o <br />"- <br />o <br />t!l <br />"- <br />o <br />.... <br />::a:: <br />8 <br />.... <br /> <br />BUILDING <br /> <br />0619 <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788~6611 <br /> <br />Permit <br /> <br />Date Ie>; 5", (') / <br /> <br />t:td$~ <br />ELECTRICAL <br /> <br />Sewer Conn <br /> <br />MECHANICAL <br /> <br />PLUMBING <br /> <br />Water Conn: <br /> <br />Property Owner: <br />Job Address: <br />Parcell.D. # <br /> <br />bS~~~~Mb <br /> <br />Water Meter: <br /> <br />T.I.F.'s: <br /> <br />Zoning: <br />Description of Work <br /> <br />Energy Code: Radon Gas: <br />~l~-j.ALenO ~-""'.N\~ -hb.n~ <br /> <br />..... <br />r..,;, <br />t!l <br />. <br />o <br />o <br />.... <br />:J> <br /> <br />FINAL <br /> <br /> <br />DATE <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />Complete Plans. Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />Valuation or <br />Contract Price <br /> <br />c.o. <br /> <br /> <br />Permit Fee <br />./Signature <br />/ Company <br />Address <br />Telephone# <br /> <br />City license Registration # ;J.-13'l <br />State Certified license# tJ?'2#tl/~~t::j I <br /> <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br /> <br />Driveway <br /> <br /> <br /> <br /> <br />Tp.SeN. SLB <br />Rough In Tub Set <br />Meter Can Water <br />Const, Pole Sewer <br />Pool Final <br />Pre-Meter ~e <br />Final /O~ s- 0 I <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br />REINSPECTION FE S: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Twenty Five and 00/100 Dollars ($25,00) shall be made for each trip for each trade: <br /> <br />a, Wrong Address <br />b, Condemned work resulting from faulty construction, <br />c. Repairs or corrections not made when inspection called, <br />d. Work not ready for inspection when called, <br />e. Permit not posted on job site, <br />f. Plans not at job site. <br />g. Work not accessible, <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />