Laserfiche WebLink
<br />Ryman Construction <br />Lot #2 Highland Loop <br /> <br /> SQ. FEET PRICE <br />MAIN OR LIVING: 1,250 $ 40.00 <br />OTHER AREA UNDER ROOF: 532 $ 15.00 <br />SLAB ONLY: 120 $ 10.00 <br />VALUATION $ 59,180.00 <br />FEE SHEET $ 310.00 <br />ADDRESS $ 20.00 <br />DRIVEWAY $ 20.00 <br /> <br />BUILDING: $ 505.00 <br />CREDIT: $ - <br />BUILDING LESS CREDIT: $ 505.00 <br />ELECTRICAL: $ 80.64 <br />PLUMBING: $ 65.00 <br />MECHANICAL: $ 35.00 <br />RADON: $ 17.82 <br />TOTAL $ 703.46 <br /> <br />SEWER: $ 1,278.00 <br />WATER: $ 350.00 <br />IRRIGATION: $ - <br />TOTAL: $ 1,628.00 <br /> <br />I <br />I <br /> <br />WATER METER:I $ <br />IRRIGATION METER $ <br /> <br />180~00 , <br /> <br />SUB-TOTAL $ <br /> <br />2,511.46 , <br /> <br />SIF'S: $ 1,694.00 <br />97.5% $ 1,651.65 <br />2.5% $ 42.35 <br /> <br />T IF'S: $ 1,480.00 <br />99% $ 1,465.20 <br />1% $ 14.80 <br /> <br />TOTAL: $ 5,685.46 l <br />