Laserfiche WebLink
<br />Description of work to be done: <br /> <br />Labor and materials to build approx. 120' steel stud walls as per sketch provided to me. <br /> <br />Insulate 520 sq. ft. of new walls. <br /> <br />Remove back doors ( Steve's Office), block in opening and install new 3' steel door. Option- Leave existing <br />doors in place and frame and drywall over inactive door. <br /> <br />Close off existing door to Steve's Office and safe opening. Cut new doorway to office where window opening <br />is located. <br /> <br />Cut and frame opening through storage room into electrical room. <br /> <br />Close off existing doorway onto Dennis' Office. Large closet in Dennis' Office is included in proposal. <br /> <br />Remove existing glass store front double doors on west side of building, block up and install window. Church <br />to furnish window. <br /> <br />Block up 3 AlC openings on south side of building. Option- Install sheet metal in opening and then frame <br />and drywall openings. <br /> <br />Hang, tape and texture approx. 70 sheets of 5/8" Type X drywall on new walls and other areas closed off <br /> <br />Price does not include: <br /> <br />Cost ofpennits <br />Plans <br />Any interior doors or labor to hang doors <br />Electrical work <br />Plumbing work <br />Painting <br />