Laserfiche WebLink
<br />BUILDING PERMITN~ <br /> <br />0810 <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788~6611 <br /> <br />Permit <br /> <br />5;).5 D <br />BUILDING ELEC~L p/G <br /> <br />P,operty Owne, 1/ M ':f: ,Lo,{5 e J( q '2-0 G <br />Job Address: :s <x- ,C:; 3 :s L () A fA A IJ e . <br />I <br />Parcel J.D. # 35-~5~~ 1- OOSYT-~ ot'JoUO-IS3b <br /> <br />Date /:J ~ f! - 0 ( <br /> <br />MEC~ <br /> <br />Sewer Conn <br />Water Conn: <br /> <br />Water Meter: <br />T.I.F.'s: <br /> <br />Zoning: Energy 55'de: Radon Gas: <br />DescriPtion of Work /rfTtI- clt; -tJ( .:5 (!.-J'of .a.1I1 ~ <br /> <br />1~9d-- <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />FINAL <br /> <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. C.O. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />Inspector <br /> <br />DATE <br /> <br />~LY <br /> <br />Valuation or <br />Contract Price <br /> <br />;;2. g<f)D. <br /> <br />tXJ <br /> <br />Permit Fee <br />)c:Signature <br />Company <br />Address <br />)c2felePhone# (813) i7q -. =r;J/ Cj. <br /> <br /> <br />City License Registration # <br />State Certified License# <br /> <br />IJ {.JA.Q.J{ <br /> <br />BUILDING <br /> <br />ELECT~ <br />./ <br /> <br />PLUMB~ <br />/' <br /> <br />MECH~L <br />....- <br />Breakers <br />Ducts Ins!. <br />Compressor <br />Final <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br />Tp. Servo <br />Rough In <br />Meter Can <br /> <br />Canst. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Twenty Five and 00/100 Dollars ($25.00) shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />c. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />