My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-0827
Zephyrhills
>
Building Department
>
Permits
>
2001
>
01-0827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:40:43 PM
Creation date
11/1/2006 8:58:35 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
01-0827
Building Department - Name
WHITE,MICHELLE
Address
5546 18TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />/ <br /> <br />PROPERTY OWNER: <br /> <br />PASCO COUNTY, FLORIDA <br />CO~TYDEVELOPMENTDIVISION <br />~OOF~ <br />)6RUrt-~ * <br /> <br />Michelle White <br />5546 18th Street <br />Zephryhills , FL.33540 <br /> <br />CASE NUMBER: 01-023 <br />PHONE NUMBER: (813) 780-1192 <br />PROJECT COORDINATOR: Mike Snyder <br />DUE DATE: August 31,2001 ' <br />REVISED: <br /> <br />--Th;s T0 IYDt- fY~.r ct <br />JAR. h6~ ,S v-n4t ~ <br />REHABILITATION SPECIFICATIONS lfat S/r~ <br />TYPE OF PERMITS REQUlRED:BUILDING X ELECTRICAL X <br />ROOFING X MECHANICAL <br />PLUMBING GAS <br /> <br />t <br /> <br />CONTRACTOR TO FURNISH UTILITIES: YES <br /> <br />NO X <br /> <br />RESIDENCE TO BE OCCUPIED DURING RENOVATIONS: <br /> <br />YES X NO <br /> <br />BID ON INDICATED ITEMS ONLY <br /> <br />Specification description of any number in extreme left hand column will be found in the General <br />----- __hSpecification13ook1~t._supplied to all bidders. -:: -When .-indicated;Lhese---numbers and their <br />corresponding descriptions are to be bid on and strictly adhered to, Contractor is cautioned to <br />verify all site conditions. All bids shall cover material required to complete work description. <br /> <br />All items such as towel bars, curtain rods, light fixtures or mirrors removed during construction are <br />to be reinstalled prior to completion unless otherwise specified, <br /> <br />No Lead-Based Paint shall be used on rehabilitation work either on existing surfaces or on new <br />construction, <br /> <br />If plans or drawings are supplied as part of these Rehabilitation Specifications they are <br />complementary. Whatever is shown or reasonably referred to in the specifications is required. <br />Scaled dimensions govern size, and large scale drawings supersede those of smaller scale, If <br />specifications require any clarifications which were not obtained prior to bidding, the designer's <br />interpretation of the true intent shall govern. <br /> <br />No additional cost will be paid above the contract amount when the Contractor has neglected <br />to properly evaluate the extent of the rehabilitation work. <br /> <br />Name: White <br /> <br />Date: 713012001 <br /> <br />Page <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.