Laserfiche WebLink
<br />BUILDING PERMIT <br />NO' <br />CITY OF ZEPHYRHILLS Permit - <br /> <br />1193 <br /> <br />(813) 780-0020 <br /> <br />Date "'/:? s .- tf'J ~, <br /> <br />BUILDING <br /> <br />ELECTRICAL <br /> <br />PLUMBING <br /> <br />MECHANICAL <br /> <br />Sewer Conn <br /> <br />",operty Owne' V~""'" "[ /I \ 0 If <br />Job Address: 3c)_S( ~ J2,.r. <br /> <br />Water Conn: <br /> <br />Water Meter: <br />T,I.F.'s: <br /> <br />Parcel I. D, , <br />Zoning: Energy Code: <br />Descriotion of Work --12p ~~ 0 <br /> <br />Radon Gas: <br />b (ee. 5e (lit CsL <br /> <br />FINAL <br />C.O. <br /> <br />- 7- O~ <br /> <br />DATE <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />Complete Plans, Specifications and Fee Must Accompany Applicationo <br />All work shall be performed in accordance with City Codes and Ordinanceso <br /> <br />DATE <br /> <br />Inspector <br /> <br /> <br />City License Registration # <br />State Certified License# <br /> <br />c-- <br /> <br />Permit Fee <br />XSignature <br />Company <br />Address <br />)<felephone# <br /> <br />ffJ'f!- ?P~ <br /> <br />Valuation or <br />Contract Price <br /> <br />'?J' p-- S93 / <br /> <br />Ftro <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br /> <br />ow~ <br /> <br />ELECTRICAL <br /> <br />PLUMBING <br /> <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Com pre <br />Final <br /> <br /> <br />Tpo Servo <br />Rough In <br />Meter Can <br /> <br />Const, Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Driveway <br /> <br />Ft~ 5 -6> ();2 7; tit' oo,Ri4, /q--- <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of twenty-five and 00/100 Dollars ($25.00) shall be made for each trip for each trade: <br /> <br />ao Wrong Address <br />b. Condemned work resulting from faulty construction, <br />c. Repairs or corrections not made when inspection called, <br />do Work not ready for inspection when called, <br />eo Permit not posted on job site. <br />f. Plans not at job site, <br />g. Work not accessible, <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />sameo <br />