Laserfiche WebLink
<br />405.------FLOORs-ZONE <br />Type <br /> <br />Total Roof Area = 2734 <br /> <br />1------------------------------------------------ <br /> <br />Insul R Ar~a(Sqft) <br /> <br />Slab on Grade/Uninsulated <br /> <br />o 1596 <br />Total Floor Area in Zone 1 = 1596 <br /> <br />2------------------------------------------------ <br /> <br />Insul R Area (Sqft) <br /> <br />405.------FLOORS-ZONE <br />Type <br /> <br />Slab on Grade/Uninsulated 0 1188 <br />Total Floor Area in Zone 2 = 1188 <br />Total Floor Area = 2784 <br />406.------INFILTRATION-------------------------------------------------- <br />I CHECK <br />Infiltration Criteria in 406.1.ABCD have been met. <br /> <br />MECHANICAL SYSTEMS <br /> <br />CHECK <br /> <br />------------------------------------------------------------------1----- <br /> <br />HVAC load sizing has been performed. (407.1.ABCD) <br />407.------COOLING SYSTEMS----------------------------------------------- <br />Type No Efficiency IPLV Tons <br /> <br />1. Split System <br />2. Split System <br />408.------HEATING <br />Type <br /> <br />1 12 12 4.58 <br />1 10.4 10.4 4.00 <br /> <br />SYSTEMS----------------------------------------------- <br /> <br />No Efficiency BTU/hr <br /> <br />1. Electric Resistance 1 .98 33140 <br />'1 Split System 1 7.25 34400 <br />409.------VENTILATION----------------------------------------------_____ <br />I CHECK <br />Ventilation Criteria in 409.1.ABCD have been met. <br />410.-----AIR DISTRIBUTION SYSTEM---------------------------------------_ <br />CHECK <br /> <br />----~~~~-~i~i~;-~~d-d~~i;~-h~~~-b~~~-~~~f~~~~d~-(~~~~~~~;~)------I----- <br /> <br />ABU Type Duct Location R-value <br /> <br />----------------------------------- ---------------------- ------- <br /> <br />1. Air Conditioners <br />2. Air Source Heat Pump <br /> <br />Unconditioned Space <br />Unconditioned Space <br /> <br />6 <br />6 <br />CHECK <br /> <br />------------------------------------------------------------------1----- <br /> <br />Testing and balancing will be performed. (410.1.ABCD) <br />411.-----PUMPS AND PIPING-ZONE ------------------_______________________ <br />Basic prescriptive requirements in 411.1.ABCD have been met. I <br /> <br />PLUMBING SYSTEMS <br /> <br />411.-----PUMPS AND PIPING-ZONE <br />Type <br /> <br />1-------------------------------________ <br /> <br />R-value/in Diameter Thickness <br /> <br />1. Non-Circulating <br />411.-----PUMPS AND PIPING-ZONE <br />Type <br /> <br />5 .5 1 <br /> <br />2--------------------------------_______ <br /> <br />R-value/in Diameter Thickness <br /> <br />1. Non-Circulating 6.6.5 1 <br />412.-----WATER HEATING SYSTEMS-ZONE 1------------------------------____ <br />