Laserfiche WebLink
<br />5104.2,.6 Certificate of Protective Treatment for prevention of <br />termites. A weather resistant jobsite posting board shall be provid~d to , <br />receive duplicate Treatment Certificates as each required protective <br />treatment is completed, providing a copy for the person the permit is <br />issued to and another copy for the building permit files. The Treatment <br />Certificate shall provide the product used, identity of the applicator, <br />time and date of the treatment, site location, area treated, chemical <br />used, percent concentration and number of gallons used, to establish a <br />verifiable record of protective treatment. If the soil chemical barrier <br />method for termite prevention is used, final exterior treatment shall be <br />completed prior to final building approval. <br /> <br />S104.2.7 Notice of termite protection. A permanent sign which identifies <br />the termite treatment provider and need for re-inspection and treatment <br />contract renewal shall be provided. The sign shall be posted near the <br />water heater or electric panel. <br />