Laserfiche WebLink
<br />Ryman Construction <br />7220 Highland Loop <br /> <br /> SQ. FEET PRICE <br />MAIN OR LIVING: 1,280 $ 40.00 <br />OTHER AREA UNDER ROOF: 480 $ 15.00 <br />OTHER: $ - <br />VALUATION $ 58,400.00 <br />FEE SHEET $ 306.00 <br />ADDRESS $ 20.00 <br />DRIVEWAY $ 20,00 <br /> <br />BUILDING: $ 499.00 <br />CREDIT: $ - <br />BUILDING LESS CREDIT: $ 499.00 <br />ELECTRICAL: $ 84.56 <br />PLUMBING: $ 67.50 <br />MECHANICAL: $ 35.00 <br />RADON: $ 17.60 <br />TOTAL $ 703.66 <br /> <br />SEWER: $ 1,278.00 <br />WATER: $ 350.00 <br />IRRIGATION: $ - <br />TOTAL: $ 1,628.00 <br /> <br />WATER METER:I $ <br />IRRIGATION METER $ <br /> <br />180~00 I <br /> <br />SUB-TOTAL $ <br /> <br />2,511.66 I <br /> <br />SIF'S: $ 1,694.00 <br />97.5% $ 1,651.65 <br />2,5% $ 42.35 <br /> <br />1 ,tcJl <br />01 ~. <br />3 <br /> <br />T IF'S: $ 1,480.00 <br />99% $ 1,465,20 <br />1% $ 14.80 <br /> <br />TOTAL: $ 5,685.661 <br />