Laserfiche WebLink
<br />CONSTRUCTION WORK CONTRACT <br /> <br />NAME OF PROPERTY OWNER: <br />JOB ADDRESS: <br /> <br />Beniamin and Oloa Rodriouez <br /> <br />39645 Meadowood Looo <br />-2 .,--, i /- <br />Zeohvrhills. FL <c. J ) L, l_ <br /> <br />CASE NUMBER: 01-478 <br />1ST <br />THIS AGREEMENT, made this --day of f\10..!:i <br />Beniamin and Oloa Rodriquez, and the Contractor, ADCO Cotllstructlon. Inc. <br /> <br />THIS AGREEMENT becomes effective and binding upon the Contractor and the Owner(s) when the <br />Notice to Proceed is issued. <br /> <br />, .;;. C)O,.;z, between the Owner, <br /> <br />ADCO CONSTRUCTION. INC. <br />Name of contract~ <br /> <br />' '7 <br />~. <br /> <br />Signature of Cant, etor ~ <br /> <br />BENJAMIN AND OLGA RODRIGUEZ <br />Name of Owner(s) <br /> <br />President <br />Title (if Officer of Corporation) <br /> <br />13390 Cortez Boulevard <br /> <br /> <br />Signa ure 0 <br /> <br />IEWED FOR COMPLIANCE WITH <br />THE FLORIDA BUILDING CODE. <br />The permitted drawings shall be kept <br />at the .it~ or work .a~d shall be open to inspection <br />"" the B..1.... Olf4i~j6~u~PN"".tiVe, <br /> <br /> <br />5-1- 0;). <br />Date <br /> <br />Brooksville. FL 34613 <br />Address of Contractor <br /> <br />t;/;p~ <br /> <br />Date <br /> <br />The Owner and Contractor Agree as Set Forth Below: <br /> <br />OFFICE COpy <br /> <br />ARTICLE 1. - CONTRACT SUM: The Owner shall authorize payment to the Contractor for the <br />performance of the construction work, subject to additions and deductions by approved Change Order, the <br />Contract Sum of Ten Thousand Five Hundred Sixty-One and 00/100 Dollars ($10,561.00). <br /> <br />ARTICLE 2. - THE WORK AND COMPLETION TIME: The Contractor agrees to furnish all labor, <br />materials, equipment, permits, licenses, and services for the proper completion of the above-identified property <br />in accordance with the Bid Documents and Specifications. The Contractor agrees that materials supplied are <br />guaranteed to be as specified. All work shall be satisfactorily completed within sixty (60) calendar days after the <br />Notice to Proceed is issued. All work shall be completed in a workmanlike manner according to standard <br />practices. The premises will be occupied during the course of construction. <br /> <br />mo/I042301/17(1) <br /> <br />-1- <br />