My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-1321
Zephyrhills
>
Building Department
>
Permits
>
2002
>
02-1321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:55:09 PM
Creation date
11/15/2006 9:12:11 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
02-1321
Building Department - Name
RODRIGNEZ,OLGA
Address
39645 MEADOWOOD LP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SPEC. <br /> <br />DESCRIPTION ~F WORK <br /> <br />19 <br /> <br />FLOOR COVERING / CARPET <br />Install new carpet over new padding. Included are <br />all closets opening into rooms to be carpeted. <br /> <br />22 <br /> <br />FLOOR COVERING / CERAMIC <br />Install new ceramic tile floor. Assume cost of tile to <br />be installed at $2.00 per sq. foot of area. <br /> <br />24 BASE & SHOE MOLDING <br />Install new pre-painted wood shoe molding on <br />all walls in newly floored areas. <br /> <br />28 ROOF SHEATHING <br />Replace any rotted sheathing and/or sheathing inadequate <br />for nailing roof covering materials. <br /> <br />30 ATTIC VENTILATION <br />Furnish and install ridge vents at all peaks(~ ~ <br /> <br />49/50 ROOFING-GENERAL SPECIFICATIONS <br />ROOFING-FIBERGLASS SHINGLES <br />Remove the existing roofing material, and old felts. <br />Replace any deteriorated wood framing and sheathing. <br />(See Spec. No. 28). Install a new Class "A" fiberglass <br />shingle roof per all requirements of the specifications <br />and applicable codesMetal drip edge is required <br />on all eaves and gables. Sheet metal must be <br />crimped tight over lip of metal drip edge on all rakes. <br /> <br />55 CEILING INSULATION <br />Check existing ceiling insulation and add insulation as <br />required to achieve R -30 in pitched roof areas. <br /> <br />62 INTERIOR WALL FINISH-CERAMIC TILE (THIN SET) <br />Remove all the existing ceramic tile on the walls and <br />floor in bathroom Install over wonderboard <br />backing a 5' - 0" high ceramic <br /> <br />OFFICE COpy <br /> <br />NAME: Rodriguez <br /> <br />DATE: 03/13/02 <br /> <br />LOCATION <br /> <br />COST <br /> <br />Bed # 1,#2,#3 <br /> <br />.ft 75,2 .-- <br /> <br />Kitchen,Li ving,Dinli;g <br />Hall& Baths ""- 3;2 4 0 .- <br />, <br /> <br />Newly <br />Tiled areas <br /> <br />./$ 375.-- <br /> <br />Exterior <br /> <br />Albw $300.00 <br /> <br />Exterior <br /> <br />$la.- <br /> <br />Entire House <br /> <br />1/~g 7.ct <br /> <br />Entire house <br /> <br />Allow $400.0 <br /> <br />Main Bath <br /> <br />.f$ 1000. - <br /> <br />PAGE TOTAL 419,03'. tJC <br />. <br /> <br />PAGE: 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.