My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-1380
Zephyrhills
>
Building Department
>
Permits
>
2002
>
02-1380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:54:46 PM
Creation date
11/16/2006 6:32:07 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
02-1380
Building Department - Name
1ST BAPTIST CHURCH
Address
3830 5TH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />406.--~---INFILTRATION-------------------------------------------------- <br />I CHECK <br />Infiltration Criteria in 40G.1.ABCD have been met. M~~ <br /> <br />MECHANICAL SYSTEMS <br /> <br />CHECK <br /> <br />------------------------------------------------------------------/----- <br /> <br />HVAC load sizing has been performed. (407.1.ABCD) h <br />407.------COOLING SySTEMS-----------------------------------____________ <br />Type No Efficiency IPLV Tons <br /> <br />---------- ----- -------------- <br /> <br />1. Air Cooled ( >= 65,000 Btu/h 1 9.5 9.5 10.00 <br />2. Air Cooled ( >= 65,000 Btu/h 1 9.5 9.5 10.00 <br />3. Air Cooled ( >= 65,000 Btu/h 1 9.5 9.5 10.00 <br />4. Air Cooled ( >= 65,000 Btu/h 1 9.5 9.5 10.00 <br />408.------HEATING SYSTEMS------------------------------------___________ <br />Type No Efficiency BTU/hr <br /> <br />1. Electric Resistance 1 10 60000 <br />2. Electric Resistance 1 10 60000 <br />3. Electric Resistance 1 10 60000 <br />4. Electric Resistance 1 10 60000 <br /> <br />409.------VENTILATION------------------------------_____________________ <br /> <br />I CHECK <br />Ventilation Criteria in 409.1.ABCD have been met. M~h( <br />410.-----AIR DISTRIBUTION SySTEM----------------------------------______ <br />CHECK <br /> <br />----~~~~-~i;i~~-~~d-d~~i~~-h~~~-b~~~-~~~~;~~d~-(~~~~~~~~~)------I-~~ <br />ABU Type Duct Location R-value <br /> <br />----------------------------------- ---------------------- ------- <br /> <br />16 <br />16 <br />16 <br />16 <br />CHECK <br /> <br />------------------------------------------------------------------/----- <br /> <br />Testing and balancing will be performed. (410.1.ABCD) ~~ <br />~ll.-----PUMPS AND PIPING-ZONE ---------------------____________________ <br />Basic prescriptive requirements in 411.1.ABCD have been met. I ~~ <br /> <br />1. Packaged <br />2. Packaged <br />3. Packaged <br />4. Packaged <br /> <br />Constant <br />Constant <br />Constant <br />Constant <br /> <br />Volume <br />Volume <br />Volume <br />Volume <br /> <br />With Insulated <br />With Insulated <br />Ventilated <br />Ventilated <br /> <br />Roof <br />Roof <br /> <br />PLUMBING SYSTEMS <br /> <br />~ll.-----PUMPS AND PIPING-ZONE 1---------------------------____________ <br />Type R-value/in Diameter Thickness <br /> <br />---------- -------- --------- <br /> <br />1. Circulating <br />i11.-----PUMPS AND PIPING-ZONE <br />Type <br /> <br />16 .75 2 <br /> <br />2--------------------------_____________ <br /> <br />R-value/in Diameter Thickness <br /> <br />---------- -------- --------- <br /> <br />1. Circulating <br />111.-----PUMPS AND PIPING-ZONE <br />Type <br /> <br />16 .75 2 <br /> <br />3--------------------------------_______ <br /> <br />R-value/in Diameter Thickness <br /> <br />---------- -------- --------- <br /> <br />1. Circulating <br />111.-----PUMPS AND PIPING-ZONE <br />Type <br /> <br />16 .75 2 <br /> <br />4----------------------------___________ <br /> <br />R-value/in Diameter Thickness <br /> <br />---------- -------- --------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.