Laserfiche WebLink
<br />-- JrllPllSal c== <br /> <br />@ 1 m 2 <br />-=:---=::-===:,~:~.--".- -.=--~-~:~ <br /> <br />2, 9<.. State Certified <br /> <br />Pages <br /> <br />~. <br /> <br />Member of the Florida <br /> <br />~ <br /> <br /> I Roofing and Sheet Metal \ Builder #CBC023221 <br /> Association [si MilBar Construction Inc. State Certified <br /> Roofer #CCC051562 <br /> U.S. Intec Certified Roofing. Concrete. Commercial . Residen~al State Registered <br /> Platinum Installer 15911 US Hwy. 301 North. Dade City, Florida 33523 <> Roofer #RC0055215 <br /> #5204 RCI Registered <br /> 352/567-6047 . 800/562-2393 . FAX: 352/567-4454 Roof Consultant #0149 <br /> PROPOSAL SUBMITTED TO PHONE I DATE <br /> SASSAMAN. MARY 813/782-6457 07/01/02 <br /> STREET JOB NAME <br />I P.O. BOX 1972 SASSAMAN RESIDENCE <br />CITY, STATE and ZIP CODE JOB LOCATION ALPHA VILLAGE <br />I <br /> ZEPHYRHILLS. FL 33539 7251 APPLEGATE DRIVE <br /> ARCHITECT I DATE OF PLANS _J: PHONE <br /> ZEPHYRHILLS, FLORIDA <br /> submit specifications and estimates for: -=-----==-- --= <br /> We hereb <br /> <br />II <br /> <br />11 <br /> <br />y <br /> <br />SHINGLE RE-ROOF <br /> <br />1. Tear off and haul away existing one-layer shingle roofing system. <br /> <br />2. Provide and install new 15 lb. saturated felt paper. <br /> <br />3. Provide and install new GAF "Royal Sovereign" 25-year 3-tab fungus-resistant <br />fiberglass shingles; Owner to select shingle color from GAF's standard colors. <br />Shingles have a 25-year 11mited warranty from GAF. <br /> <br />4. Replace all damaged flashirigs (valley, vent, or any wall flashing). <br /> <br />5. Provide and install new lead boots for the plumbing vents. <br /> <br />6. Provide and install new pre-finished aluminum eavedrip (white or brown). <br /> <br />7. The existing gutter system is to remain in place <br /> <br />8. <br /> <br />Any rotten or damaged wood deck, <br />re-nailing of the existing roof <br />and beyond the contract price. <br />and material. ) <br /> <br />fascia, trim, framing, etc. replacement or <br />deck will be completed on a cost-plus basis above <br />($50.00 per 1/2"x4'x8' sheet of plywood used, labor <br /> <br />9. MilBar Construction, Inc. to provide 5-year warranty on workmanship; exclusions: <br />storm damage, work done or damage by others, tree damage, and/or structural damage <br />to roof deck. <br /> <br /> <br />I______------~ ___ <br />r~------ - --=-~_==,=::=:c-:=_=----- <br /> <br />i ~t Jropost hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: <br /> <br />I SEE PAGE TWO. dollars ($ ). <br />Payment to be made as follows: <br /> <br /> <br />II Invoiced amounts not paid In accordance with the payment terms shall be considered delin- <br />quent and bear interest at the rate of one and one-half percent per month. Owner agrees to <br />pay all costs incurred, such as attorney fees, collector fees, court costs, etc., for collection <br />Ii of delinquent invoices including interest. Owner to carry fire, tornado and other necessary <br />~ insurance. Our workers are fully covered by Workman's Compensation Insurance. <br /> <br />-r-- <br /> <br />[I' / J\.c.c.ephtn.c.e of Jtoposal - The above prices, specifications <br />I and conditions are satisfactory and hereby accepted. You are authorized <br />I[ to do the work as specified. Payme~t rill bl made as outlined above. <br /> <br />~> Date of Acceptance: 1/L Ei. /O,J........ <br /> <br />Authorized <br />Signature <br /> <br />Note: This proposal may be <br />withdrawn by us if not accepted within <br /> <br />30 <br /> <br />days. <br /> <br />Signature <br /> <br />_J <br /> <br /> <br />1JU~~ :r~~=~l <br /> <br />.// <br /> <br />Signature <br />