My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-1722
Zephyrhills
>
Building Department
>
Permits
>
2002
>
02-1722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 2:53:12 PM
Creation date
11/30/2006 9:30:58 AM
Metadata
Fields
Template:
Building Department
Permit #
02-1722
Building Department - Name
CONCIRE CENTER INC
Address
7422 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Uec I~ U~ US:2B.. <br /> <br />HUNTINGTON ROOFING IHe <br /> <br />(8631665-5878 <br /> <br />p.2 <br /> <br />HUNTINGTON ROOFING, INC. <br />3375 Highway 98 Soulh <br />Building B Suite 2 <br />Lakeland. Florida 33803-8340 <br />(8&) 667-1275 <br />L.C.' CCC 056661 <br /> <br />December 18, 2002 <br /> <br />Concire Centers, Inc. <br />Shopping Center Developer <br />411 COmmercial Court St.. E <br />Venice, FL 34292 <br />Attn: Sally Harper <br /> <br />RE: REPAIR RUBBER ROOF ON K-MAftT STORE U751, ZEPHYRHIllS, <br />FlORIDA. <br /> <br />Thank you for allowing us the oPPortunity to be of service to <br />you. We appreCiate YOUr business!!! We have examined the <br />Roof on the afore mentioned bUilding, as you requested, and <br />submit the following proposal for your conSideration. <br /> <br />HUNTINGTON ROOFING, INC. WILL FURtUSH ALL LABOR. AND MATERIALS <br />NEEDED TO COUPETE T"e FOLLOWING. <br /> <br />1. Move eXisting Ballast (ROCk) from work area. This will be <br />done in each area being recovered, as work progresses a- <br />cross the Roof. <br /> <br />2. The existing in place Rubber ROOf Membrane Will be cut, <br />using a utility knife, so as to allow the new Roofing SYs- <br />tem to move independently when installed. If not cut the <br />two Rubber Membrane's may become stUCk together, and hinder <br />the design of the new Roofing System, to move as weather <br />conditions will dictate. <br /> <br />3. The eXisting 2 inch Poly Styro Insulation will remain in <br />place, and will b~ reused. There is no need to remove this <br />Insulation, because it appears to be in very good condi- <br />tion, and it will save a lot of money. <br /> <br />4. FUrniSh, and install a new .045 EPDM Rubber Roof System <br />directly Over the existing reu9.ed Poly Styro Insulation, <br />and neWly cut eXisting EPOM Membrane Roof material. The <br />new Rubber Membrane will be loose laid into place. The <br />newly created seam area's of Membrane to Membrane Joining <br />will be completed using a 3 inch Quick Seam Splice Tape, <br />and aPPrOVed a.dhes 1 ve. A 11 seam; ng wi 11 be done as per the <br />ManUfacturers specifications, and recommendations. <br /> <br /><::-d <br /> <br />06L0SSVlV6 3~IONOO ~~ <br /> <br />vf\1<::S' 6 <::0<::-0<::-<:: l <br />
The URL can be used to link to this page
Your browser does not support the video tag.