<br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
<br /> CHAPTER 4 - Commercial Building Compli~nce Methods
<br />FORM 400C-Ol CENTRAL
<br />limited and Special Use Buildings Climate Zones 4 5 6
<br />Project Name: 1) f". F ('n"-..lS,C? 11 r'T I()t-,) . I Ur Zone: 4
<br />Address: p (). (?,Oi ~\t~1 Building Classification: OFFI C~
<br />City, Zip Code: PI f\ ~J" ( 1'1'/ I-L... ~~;'~ ~, {.-1 ?~ Building Permit No.:
<br />Builder: Permitting Office:
<br />Owner: Jurisdiction No.: '(", 1(000
<br /> -, -u-Ill'::>>
<br />WALLS ROOF/CEILING flOORS DOORS GLASS
<br />TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA
<br />Concrele (CBS Under Attic l(n ? Slab-on-nrade \[- 17 Wood '7 '1-n Slnnle wall r.
<br />Wood frame I(nfnn Sinole Assemblv Raised Wood Metal Double wall
<br />Metal frame Other: Raised Concrete Insulated Sinnle roof
<br />Insulation R-value Insulallon R-value Insulation R-value Other Double rool
<br />
<br /> SYSTEMS INFORMATION
<br /> AIR CONOmONER HEATING "YSTEM HOT WATER
<br />TYPE EFFICIENCY TONS TYPE EFFICIENCY BTUIH TYPE
<br />Unitary & Heal Pump jQ SEER Central & Heat Pump Electric -'
<br /> 2- G..'l. HSPF /
<br /><65,000 Btu/h <65,000 Btuth - Resistance -' / 0
<br />2:65,000 Btu/h _EER _IPLV - 2:65,000 Btulh _COP - Dedicated Heal Purpp/ 0
<br />Waler cooled _EER _IPLV - Water cooled _COP - Gas //
<br />Evaporatively cooled _EER - Evaporatively cooled _COP - Natural 0
<br />PTAC _EER - Electric Reslstance _COP - LPG 0
<br />Chiller _COP _IPLV - Gas/Oil (circle one) HRU 0
<br />Gas heat pump _COP - <225,000/300,000 Btulh _AFUE - at 0
<br />Other: 2:225,OOIlI3OO,OOO Btulh E,
<br />LIGHTING Tolal Lighting Wattage =----3Q{O 0 I, <:6'1 , SIZING CALCULATION I DUCTS R-value (17
<br /> = G2J ATTl e-
<br />Total Conditioned Floor Area \ (0 \--z... Watts/sq.ft_ Attached Location
<br />
<br />'---' PAESCAlPTIVE MEASUHES (MulIt be met or exceeded by all buildings.)
<br />~-
<br />Components Section Requirements Check
<br />Operations Manual 102.1 Operations manual will be Drovlded to owner_ ---_._- v
<br />Windows & Doors 406_1 Maximum: _3 clm oer SQ.ft. of window area- Maximum: 1.2 cfm per SQ.ft. of door area_ /'
<br />Joints/Cracks 406.1 To be caulked. oasketed, weatherstrlDDed or otherwise sealed. /
<br />Dropped Ceiling Cavitv 406.1 Vented: seal and insulate cellina (no T-bar ceillnlls\. Unvenlad, no ceilinll air barrier: seal and insulate rool and side walls. /
<br />Reheal 407.1 Electric resistance reheat prohibited_ -
<br />Ventilallon 409_1 SUPDlled with readily accessible switch lor shut-off andlor volume reduction when venlllation is not required. V
<br />HVAC Efficiency 407.1,408.1 Minimum efflclencles - Heating: Tables 4-7, 4-B, 4-9. Cooling: Tables 4-3, 4-4, 4-5, 4-6_ v'
<br />HV AC Controls 407.1 Separale readily accessible manual or automatic Ihermoslallor each system_ -"
<br />HV AC Ducts 410.1 Air ducts, Imings, mechanical equipment and plenum chambers shall be mechanically attached, sealed, insulated
<br /> and Installed In accordance with the criteria of seclion 410_ 1. V"
<br />Balancing 410_1 HVAC distribution system(s) tested and balanced_ ........
<br />Piping Insulation 411.1 In accordance with Table 4-11. ,/
<br />Water Healers 412_1 Automatic electric storage water healers 5120 gallons and gas & oil fired storage water healers 95,000 Btulh shall meet
<br /> peoformance requirements In Table 4-12_ Eleclric > 120 gallons: standby loss So.3IJ+27Ny_ Gas >75,000, 011 > 105,000: E, .7B, -
<br /> Standby loss So 1.30+114Ny_ Gas, 011 >155,000: E,.7B, Standby 1055 So 1_3ll+95/Vy_
<br />Swimming Pools 412_1 Spas & heated pools must have covers_ Non-commercial pools must have pump timer. Gas spa & pool heaters must
<br />& Spas have a minimum thermal efficiency 01 7B%_ -
<br />Hot Water Pipe 412_1 Piping heal loss 15 limited 10 the levels in Table 4-11 for circulaling systems and the first 8' of pipe from a storage
<br />Insulation tank. -
<br />Water Fixtures 412.1 Shower head waler flow restricted to maximum 012_5 gpm at 80 psi. Toilets meet 42CFR 6295(k)_ Public lavatory fixture
<br /> maximum flow 01 .5 gpm; or lIsell-closing valve, .25 gallon circulating, .5 gal/on non-circulating. ../
<br />Lighting 415.1 Bellasts shall have Power Factors no less than .90. V
<br />
<br />If required by Florida law, I hereby certify that the system design 15 in compliance with. the Florida Energy Code.
<br />ARCHITECT: ART Sj IT2.EL P. E-
<br />,
<br />ELECTRICAL SYSTEM DESIGNER:
<br />LIGHTING SYSTEM DESIGNER:
<br />MECHANICAL SYSTEM DESIGNER:
<br />PLUMBING SYSTEM DESIGNER:
<br />
<br />Registration No_
<br />FL ::t.*:: S{71..,c,g
<br />
<br />Compliance with Chapter 4 was demonstrated by II Prescriptive Measures methodology:
<br />Detached Buildings <200 sq.ft_ 0 Convenience stores <5,000 sq.ft.
<br />Skyboxeslsports stadiums 0 Restauranls <5,000 sq_ft.
<br />Traffic safety control towers 0 Retail stores <5,000 sq.ft.
<br />
<br />o
<br />o
<br />o
<br />
<br />Office buildings <5,000 sq.ft.
<br />School buildings <5,000 sq.f1.
<br />Storage buildings <5.000 sq. ft.
<br />
<br />~
<br />o
<br />o
<br />
<br />
<br />I hereby certily Ihat the pia
<br />Florida Energy Code.
<br />
<br />Review 01 plans and specifications covered by this calculation indicalas compliance wilh
<br />!he Florida Energy Code. Belore constlUCtion is compleled. this building will be inSpecled
<br />lor compliance in accordance wilh Section 553.908. F.S.
<br />
<br />OWNER AGENT:
<br />
<br />DATE
<br />
<br />BUilDING OFFICIAL:
<br />DATE:
<br />
<br />FlORIDA BUILDING CODE - BUILDING
<br />
<br />13.167
<br />
|