My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-1838
Zephyrhills
>
Building Department
>
Permits
>
2003
>
03-1838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:09:36 PM
Creation date
12/5/2006 11:44:21 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
03-1838
Building Department - Name
EMERALD POINT
Address
LOT 259 TOURMALINE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Property Owner: <br />Job Address: <br />Parcell.D. , <br />Zoning: Energy Code:, <br />Description of Work <; (? c,..) U , I ....."L <br /> <br />BUILDING <br /> <br />BUILDING PERMIT <br /> <br />CITY OF ZEPHYRHILLS Permit N~ <br /> <br />1838 <br /> <br />(813) 780-0020 <br /> <br />oP,/3-0 3 <br /> <br />Date <br /> <br />ELECTRICAL <br /> <br />PLUMBING <br /> <br />MECHANICAL <br /> <br />Sewer Conn <br />Water Conn: <br /> <br /> <br />Water Meter: <br />T.I.F.'s: <br /> <br />Aadon Gas: <br /> <br /> <br />FINAL <br />C.O. <br /> <br />-o~ <br />DATE <br /> <br />NO OCCUPANCY BEFORE C.O. <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />Valuation or <br />Contract Price <br /> <br />DATE <br /> <br /> <br />Inspector <br /> <br />Permit Fee <br />><::j)ig natu re <br />Company <br />Address <br />.0elephone# <br /> <br />~(. ~ <br />~ --}: ~~--..,,):::'t &.d/~ <br />, // <br /> <br />/1;) 0 <br /> <br />City License Registration # <br />State Certified License# <br /> <br />(!IY) )R ~~ q S'A.D <br /> <br />Ftr. <br />Pre SLB <br />Lintel <br />FRM. <br />Insul. CL <br />WL <br /> <br /> <br />Driveway <br /> <br />~ D. - . <br />. ~f\.( s 0; ({,<'-\MtS. <br /> <br /> <br />PLUMBING <br /> <br />MECHANICAL <br /> <br /> <br />Tp. Servo <br />Rough In <br />Meter Can <br /> <br />Const. Pole <br />Pool <br />Pre-Meter. <br />Final <br /> <br />SLB Breakers <br />Tub Set Ducts Insl. <br />Water Compressor <br />Sewer ,...j - / 7- t?:J J:( 'I'" /{JO Final <br />Final <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of twenty-five and 00/100 Dollars ($25.00) shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction. <br />c. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e. Permit not posted on job site. <br />f. Plans not at job site. <br />g. Work not accessible. <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same. <br />
The URL can be used to link to this page
Your browser does not support the video tag.