My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-1876
Zephyrhills
>
Building Department
>
Permits
>
2003
>
03-1876
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:09:26 PM
Creation date
12/5/2006 2:45:29 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
03-1876
Building Department - Name
GONZALEZ,MANUEL
Address
37451 NEUKOM AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1. SPEC IAL CIRCUMSTANCES: If the following cOndnlons oceu r - STO PI Contact Oliver Techn%gie s at <br />1-800-284-7437: a) Pier height exceeds 48~ b) Roof eaves exceed 16~ <br />c) Sidewall height exceed 96' d) Roof Pftch 5/12 or greater e) Location Is wfth in 1500 feet of COast <br /> <br />Oliver Technologies, Inc. <br />FLORIDA INSTALLATION INSTRUCTIONS FOR THE <br />MO EL 1 01 S R S LL STEEL FOUNDATION SYSTEM <br />MODEL 1101 (STEPS 1-15) <br />MODEL 1101-L LONGITUDINAL ONLY: FOLLOW INSTRUCTIONS 1-11 . <br /> <br />2. Remove weeds and debris in an approximate two foot square to expose finn soil for each ground pan (C) . <br />3. Piace ground pan (C) directly below chassis I-beam. Press or drive pan finnly Into soil until flush wfth or below SOil. <br />SPECIAL NOTE: The longftudinal cross brace system serves as a pier under the home and should be loaded as any <br />other pier. it Is recommended that after leveling piers, and one-half Inch (112') before home is lowered completely on <br />to piers, complete items 4 through 10 below. <br /> <br />INSTALLATION OF GROUND PAN <br /> <br />INSTALLATION OF LONGITUDINAL CROSSBRACE SYSTEM <br /> <br />NOTE: IF INSTALUNG THE MODEL # 1101-L LONGITUDINAL ONLY, A MINIMUM OF 2 SYSTEMS PER <br />FLOOR SECTION IS REQUIRED, AND ALL SIDEWALL ANCHORS SPACED AT 5' 4". FOUR FOOT (4') <br />GROUND ANCHOR MAY BE USED EXCEPT WHERE MANUFACTURERS SPECIFY A DIFFERENCE. <br /> <br />4. Select the COrrect square lube brace (E) length for set - up (pier) height at support location. (the lB' tube is always <br />used as the bottom part of the longitudinal arm). <br /> <br /> <br />1.25" ADJUSTABLE <br />Tube Length <br /> <br />1.50" ADJUSTABLE <br />Tube Length <br /> <br />:;~iHi.lr_EfNiJt.. '.;-"-~.';:e:biffl!4~4d:i!i}.kt:"WK <br /> <br />32" <br /> <br />18" <br /> <br />54" <br /> <br />5. Install (l)ofthe 1.50' square tube (E (lB- tube)) Into each 'U' bracket (0), insert carriage bohs and ieave nuts <br />loose for final adjustment. <br />6. Place I-beam connector (F) loosley on the bottom flange of the !-beam. Tum COn nectar so thatthe tube connector <br />braCket is off center on same side as ground pan 'U' brackel (0) for other en.d of tube so that tubes will cross. <br />7. Slide the selected 1.25' lube (E) into a 1.S0'lube (E) and attaCh to I-beam connector (F) and fasten loosely with <br />bolt and nut. <br />B. Repeal steps.s through 7 to creale the crossed 'X' pattem of the square tubes lOOSely in place. NOTE: The angle is <br />not to exceed 45 degree and not below 40 degrees. <br />9. Install bractng bolls and plates (G) In the horizonlal direction only, around both square tubes where they cross. Put <br />nuts on bolt ends and tighten, IMPORTANT: Do not crush tube. <br />10. After aU bohs are tlghlened, secure 1.25' and 1.50' tubes using four(4) 1/4"-14 x 314" sell-tapping screws in pre- <br />drilled holes. <br />11. InstaU remaining vertical tie-<lown straps and 4' ground anchors per home manufacturer's Instructions. All loads in <br />excess Of3,1S0 pounds at shear walls, COlumns, and centertine, must have five foot (5) anchors Installed regardless <br />of Soil Conditions, per the state of Florida. . <br /> <br />18" <br /> <br />fNSTALLA ON OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM <br /> <br />NOTE: THE MODEL 1101 (LONGITUDINAL & LATERAL PROJECTION) ELIMINATES THE NEED FOR ALL <br />STABILIZER PLATES & FRAME TIES <br />12. Select the correct square tube brace (Ii) length for set-up lateral transverse at support location. The lengths Come in <br />ei/her 60' or 72' lengths. (Wdh the 1.50" lube as the b01tom tube, and the 1.25" lube as the Inserted lube.) <br />13. tnstall the 1.50 transverse brace (Ii) to the ground pan connector (0) wllh boh and nut. <br />14. Slide 1.25' transverse brace Into the 1.50' brace and attach 10 adjacent I-beam connector ( , ) wfth bolt and nut. <br />15. SeCUre 1.50' transverse ann to 1.25' transverse ann using four (4) 1/4" _ 14 x 3/4' self-tapping screws in pre-drilled <br />holes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.