Laserfiche WebLink
<br />Ryman Construction <br />Lot #7 Highland Loop <br /> <br /> SQ. FEET PRICE <br />MAIN OR LIVING: 1,280 $ 50.00 <br />OTHER AREA UNDER ROOF: 489 $ 25.00 <br />OTHER: - $ - <br />VALUATION $ 76,225.00 <br />FEE SHEET $ 388.00 <br />ADDRESS $ 30,00 <br />DRIVEWAY $ 30.00 <br /> <br />BUILDING: $ 642.00 <br />CREDIT: $ - <br />BUILDING LESS CREDIT: $ 642,00 <br />ELECTRICAL: $ 112.50 <br />PLUMBING: $ 92.50 <br />MECHANICAL: $ 67.00 <br />RADON: $ 17.69 <br />TOTAL $ 931.69 <br /> <br />SEWER: $ 1,616.00 <br />WATER: $ 419.00 <br />IRRIGATION: $ - <br />TOTAL: $ 2,035.00 <br /> <br />I <br />I <br /> <br />WATER METER:I $ <br />IRRIGATION METER $ <br /> <br />180~00 I <br /> <br />SUB-TOTAL $ <br /> <br />3,146.69 I <br /> <br />SIF'S: $ 1,694.00 <br />97,5% $ 1,651.65 <br />2.5% $ 42.35 <br /> <br />TI F'S: $ 1,480.00 <br />99% $ 1,465.20 <br />1% $ 14.80 <br /> <br />, <br /> <br />TOTAL: $ 6,320.691 <br />