Laserfiche WebLink
<br />I <br />/ <br /> <br />~~~ ~-~.---'--" -,~-_............--- -'- - -------_._-,-:-.----_.-..------~---~--~-=--=--=-:....:;.. <br /> <br />/ <br /> <br />SCHAPER <br /> <br />I <br />/ <br />I <br />/ <br /> <br />ROOFING 1 me <br />11250 S. Hwy. 98, Dade City, Florida 33525 Phone: 352-567-8580 Fax 352-567-7073 <br />STATE CERTIFIED BUILDING AND ROOFING CON1R.ACTOR # CC-C0S8134 CB-C059817 <br />Serving Florida's Finest Homes & Business Since 1976 <br /> <br />/ <br /> <br />CONTRATOR WARRANTY <br />Upon completion of the work and payment of all monies owed. Contractor s~all issue a_5_ <br />year warranty for workmanship limited to leaks caused by any component inStall by the <br />contractor. Shingle manufacturer shall provide a _30 _ year limited warranty. <br /> <br />Bl.JR REPLACE:MENT <br /> <br />9. For the flat roof portions of the home, remove old roofmg materials to dry-in, taking <br />precautions to protect the building and the landscaping. G1'oom the deck and reset existing <br />decking nails. <br />10. Replace bad wood other than herein agreed for at _$36.00 _ per man-hour plus materials <br />marked up a _25%_ contractor's fee. <br />11. Install fiberglass base sheet utilizing proper fasteners and fastening pattern and install outer <br />edge strip in of modified binnnen as foundation for edge metal. <br />12. Install _white _ permanent fmish edge metal. <br />13. Install modified bitumen roof system. <br />14. If applicable, install new lead boots over vent pipes and reseal. <br />15. If applicable, install new all purpose roof'V-ents and reseal. <br /> <br />Contractor warranty <br />Upon completion of the work and payment of all moines owed. Contractor shall issue a " <br />year warranty for workmanship limited to leaks caused by any component install by the <br />contractor. The modified binnnen manufacturer shall provide a _12 _ year warr..nty. <br /> <br />. General Condition <br />All work shall be carefully supa-vised and completed by workmen skilled and knowledgeable in <br />methods needed to produce high quality work. The job site shall be kept clean daily for Li.e duration <br />of the job and the grounds shall be left clean of all roof related debris after completion. The yard <br />shall be swept with a magnet. Collection costs if any, together with interest shall be added to the <br />contract price if payment default occurs. Cancellation of the contract after the 72-hour grace period <br />shall incur a nominal fee. Permit workman compensation. and general liability insurance shall be <br />provided by the contractor. Carpentry, authorized change orders and work. which is not covered <br />under the scope of work outlined herein. shall be performed on a time and materials basis unless <br />otherwise agreed upon. <br />