My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-2056
Zephyrhills
>
Building Department
>
Permits
>
2003
>
03-2056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:08:40 PM
Creation date
12/19/2006 9:27:04 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
03-2056
Building Department - Name
SOUTH CEN NURSHIN HO
Address
38250 A AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ 3(\1 ( <br />2!J \ t" <br />>II ~ ( /VdT y; ,,) <br />SCHAPER ROOFING, INC. ".~ .. ~~ <br /> <br />11250 US Highway 98 South, Dade City, FL 33525 '0) J-LJ ./ <br />Ph: (352) 567-8580 & (813) 782-0920 Fax: (352) 567-7073 .~.yyz/!< . "=J;: <br />STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR #C8-C059817 and #CC-C05813~ . <br />Serving Florida's Finest Homes & Businesses since 1976 f(~ <br /> <br />Name 2-e/~A1A..~~ ~ IVJ (2 5,'; ,,YtJ-C. 7,"tj Date / /J :2 C7/IOJ <br />Address :].c:{ 2-$ 0 f) J-t'/U <./-<. 4, Phone ?<62 - 550 ~ <br /> <br />:;z.~A )Sri' ~ : J ( ~ r:: t 3 .3 S'-I L..... City/County ~> C 0 <br />Parcel # ;6 ~( 2- 1-0 7~-..r <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />1. Barricade off work area as needed. <br /> <br />----- J <br />,J ?.,;;-?-> r <br />5&t.f~~ <br /> <br />Duro Last roofing system <br /> <br />2. Remove loose debris from flat roof. <br /> <br />3. Remove existing flashings and boots as required. <br /> <br />4. Check substrate decking for water damage. Replacement of decking will be done on a time and <br /> <br />material basis at the rate of $36.00 dollars per man-hour plus materials marked up a 25% contractors <br /> <br />fee. <br /> <br />5. Install fan fold insulation, mechanicatly attached per Duro Last specification. <br /> <br />6. Install Duro Last membrane for a IS-year material and labor warranty. <br /> <br />7. Install new Duro Last boots, custom curb and corners as required. <br /> <br />8. Install Duro Last two-way vents as required. <br /> <br />9. Install Duro Last 4" drip edge and 1 3/4" fascia with cover as required. <br /> <br />10. Disconnect and reconnect NC units and chiller. Schaper Roofing will not be responsible for <br /> <br />existing conditions of the wiring, freon lines, ductwork, electrical or the units due to the age of the units. <br /> <br />", <br /> <br />11. Disconnect and remove old electrical stands and build new and remount electrical on new stands. <br /> <br />Schaper Roofing will not be responsible for existing conditions of wiring or conduit lines. <br /> <br />12. Tie roof system into existing 3 tab shingle roof cedar blend color. <br />Server Qi My Documentsl Ward Documents! Durol Duro Last.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.