Laserfiche WebLink
<br />--"-"--> ". <br /> <br />Schaper Construction & Roofing', <br />11250 S. HWY 98 Dade City, FL 33525 Phone 352-567-8580 Fax 352-567-7073 <br />State Certified CB C059817 &CC C058134 <br />Serving Florida's Finest Homes & Businesses <br /> <br />Since 1976 <br />r/~:LI c) .3- <br />Date: 3/27/03 <br /> <br />Inc. <br /> <br />Attn: Rod Shelton <br />Florida Medical Clinic <br /> <br />Phone: 813-618-0048 F813-788-4411 <br /> <br />~ounty -:2' iJ <br />( <br /> <br />38045 Market Square <br /> <br />Zephyrhills, FL 33542 <br /> <br />Parcel # _roof for Pharmaceutical Building <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />PVC CPA roofing system <br /> <br />1. Barricade off work area as needed. <br />2. Remove loose debris from flat roof. <br />3. Remove existing flashings and boots as required. <br />4. Check substrate decking for water damage. Replacement of decking will be done on a time and material <br />basis at the rate of $36.00 dollars per man -hour plus materials marked up a 25% contractors fee. <br />5. Install insulation, mechanically attached per manufacturers specification. <br />6. Install PVC CPA membrane for a IS-year material and labor warranty or material warranty. <br />7. Install new boots, custom curb and comers as required. <br />8. Install two-way vents as required. <br />9. Remove and reuse existing coping metal as required. <br />10. Install 1 3/4" fascia with cover as required. <br />11. Every attempt to reposition the satellite will be made but no guarantee will be given that it will be <br />successful. <br /> <br />Contractor warranty Upon completion of the work and payment of all monies owed. Contractor shall issue a <br />two (2) year warranty limited to leaks caused by any component install by the contractor. Manufactures shall <br />issue a fifteen (15) warranty on workmanship and materials or materials warranty. <br /> <br />General Conditions All work shall be carefully supervised and completed by workmen skilled and <br />knowledgeable in the methods needed to produce high quality work. The job site shall be kept clean daily for <br />the duration of the job and the grounds shall be left clean of all roof related debris after completion. The yard <br />shall be swept with a magnet. Collection costs if any together with interest shall be added to the contract price <br />ifpayment default occurs. Cancellation of the contract after the 72-hour grace period may incur a nominal fee. <br />The contractor shall provide permit, Workman compensation, and general liability insurance. Carpentry, <br />authorized change orders and work, which are not covered under the scope of work outlined herein, shall be <br />performed on a time and materials basis unless otherwise agreed upon. <br />