My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-2130
Zephyrhills
>
Building Department
>
Permits
>
2003
>
03-2130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:08:16 PM
Creation date
12/20/2006 9:42:50 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
03-2130
Building Department - Name
VASQUEZ,MANUEL
Address
5740 7TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Hood to be 18 gauge galvanized or stainless steel, 24" H, and overhang <br />cooking equipment 6" on all open sides. <br />All joints to be continuous, liquid tight external weld. <br />Grease filters to be UL Listed and sized to facilitate airflow at a rate <br />consistent with listing requirements. <br />Filters shaH be framed, and frame sealed to canopy in such manner as to <br />prevent grease from passing between collection area and plenum area. <br /> <br />Hood to be supported by material equal to that used for hood construction. <br /> <br />Exbaust duct to be 16 gauge galvanized steel with all joints either lapped or <br />butted and welded with continuous, liquid tight external weld. Hood-to-duct <br />joint may be welded internally with no grease traps formed. <br /> <br />Clearance. Hood and exhaust duct to be min. ] 8" clear of combustibles or <br />protect per NFPA-96 or Florida Mechanical Code. <br /> <br />Exhaust roof mounting curb to be 16 gauge, welded, sealed to exhaust duct, <br />and hinged to blower allowing access for cleaning and burglars. <br /> <br />Airflow: <br />( exhaust to be min. 100 CFM PSF hood opening on hoods with 2 or three <br />Sides open, as required for others.) <br />· Hood opening :2 I . 011-{ <br />· Total exhaust required :2 J '" '" <br />· Duct size f J " X I l-# <br />· Duct velocity '7 Dol FPM @ .. 3 <br />· Exhaust blower: <br />Model Cock 16 j-Y ~ 8 <br />RPM '12)' <br />Elect. Req. tiS- V I tP <br />· Make-up air approximately equal to exhaust and provided by: <br />Model le;2. SC'167 t>;>''fth;.L,..e.f'~''f <br />Elect. Req. J' ') V I cP <br />Discharge through ce ; (p, 9 d.. f.f1.4 sev- <br />Airflow test and adjustments to be accomplished upon start-up. <br /> <br />Sq.Ft. <br />CFM <br /> <br />" <br /> <br />" SP <br /> <br />UL Listed for grease removal <br />
The URL can be used to link to this page
Your browser does not support the video tag.