Laserfiche WebLink
<br />Gold Medallion <br />6348 Birmingham <br /> <br /> SQ. FEET PRICE <br />MAIN OR LIVING: 1,636 $ 50.00 <br />OTHER AREA UNDER ROOF: 761 $ 25.00 <br />OTHER: - $ - <br />V ALUA TION $ 100,825.00 <br />FEE SHEET $ 483.00 <br />ADDRESS $ 30.00 <br />DRIVEWAY $ 30.00 <br /> <br />BUILDING: $ 784.50 <br />CREDIT: $ - <br />BUILDING LESS CREDIT: $ 784.50 <br />ELECTRICAL: $ 108.50 <br />PLUMBING: $ 103.00 <br />MECHANICAL: $ 75.90 <br />RADON: $ 23.97 <br />TOTAL $ 1,095.87 <br /> <br />v <br /> <br />./ <br />./ <br />.,/ <br />y' <br /> <br />SEWER: $ 1,616.00 <br />WATER: $ 419.00 <br />IRRIGATION: $ 175.00 <br />TOTAL: $ 2,210.00 <br /> <br />v <br /> <br />v' <br />V <br /> <br />WATER METER: $ <br />IRRIGATION METER $ <br /> <br />180.00 L <br />180.00 j <br /> <br />SUB-TOTAL $ <br /> <br />3,665.87 Iv' <br /> <br /> <br />w~ ~t (J,O" <br />c <br /> <br />SIF'S: $ <br />97.5% $ <br />2.5% $ <br /> <br />T IF'S :1 $ <br />99% $ <br />1% $ <br /> <br />- I <br /> <br />TOTAL: $ <br /> <br />5,359.87 I <br />